Figure 3-1 – Model Extent with 1 meter Contours
3.3 Temporal Patterns and Rainfall Intensity
Temporal patterns are based on Australian Rainfall and Runoff (ARR) 2019 Ensemble Storm Temporal
Patterns and have been sourced directly from ARR data hub. Rainfall intensities are typical for this area
and have been sourced directly from the Bureau of Meteorology (BOM).
3.4 Rainfall Durations
Initially, flood modelling was undertaken for all rainfall durations ranging from 10 minutes to 720 minutes.
This range of durations was simulated to ensure the critical durations for the catchment were captured.
From reviewing the results, it was determined that the critical durations experienced at the proposed
development site and immediately surrounding the site ranged from 20 minutes up to 360 minutes and
therefore these were the durations adopted for this analysis.
3.5 Rainfall Losses
Adopted rainfall losses were sourced from ARR Data Hub. Rainfall losses for this region are as follows:
• Initial Losses – 27.2 mm; and
• Continuing Losses – 2.8 mm/hr.
The losses were scaled up to consider 1.0 degree of warming.
Flood Impact Assessment Page 8 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Flood Impact Assessment - Covey.pdfRelated documentApplication case desk ↗
About this file
- File size
- 68.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.