OPW15/0122 Application for Vehicle Crossover
OPL1SJO (ZZ, DeparrMenrOn Stale De verepiteam “infrastrocture and Planning } & Counter IDAS form 1—Application details | (Sustainable Planning Act 2009 version 4.1 effective 4 July 2014) | | | 13 JUL 201 Tewantin This form must be used for ALL development applications. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. For all development applications, you must: e complete this form (IDAS form 1—Application details) e complete any other forms relevant to your application e provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning Regulation 2009. _ This form and any other IDAS form relevant to your application must be used for development applications relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. PLEASE NOTE: This form is not required to accompany requests for compliance assessment. This form can also be completed online using MyDAS at www.dsdip.qid.gov.au/MyDAS Mandatory requirements Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any development permit or preliminary approval that may be issued as a consequence of this application will be issued to the applicant.) Name/s (individual or company name in full) John Dunn & John Nickel For companies, contact name Postal address PO Box 993 Suburb Noosa Heads State Queensland Postcode 4567 Country Australia Contact phone number 0413 944473 Mobile number (non-mandatory requirement) Fax number (non-mandatory requirement) Great state. Great opportunity.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 20 pages
Page 2
Email address (non-mandatory requirement) [email protected] @ Applicant’s reference number (non-mandatory requirement) 1. What is the nature of the development proposed and what type of approval is being sought? Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.) a) Whatis the nature of the development? (Please only tick one box.) C] Material change of use im Reconfiguring a lot oO Building work if Operational work b) What is the approval type? (Please only tick one box.) Cc Preliminary approval CL Preliminary approval L] Development permit under $241 of SPA under s241 and s242 of SPA c) Provide a brief description of the proposal, including use definition and number of buildings or structures where applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.) New driveway d) Whatis the level of assessment? (Please only tick one box.) | Impact assessment A Code assessment Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C— Additional aspects of the application.) a) Whatis the nature of development? (Please only tick one box.) L] Material change of use C Reconfiguring a lot C] Building work oO Operational work b) What is the approval type? (Please only tick one box.) C Preliminary approval CO Preliminary approval L] Development under s241 of SPA under s241 and s242 permit of SPA c) Provide a brief description of the proposal, including use definition and number of buildings or structures where applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.) d) Whatis the level of assessment? oO Impact assessment LE] Code assessment Table C—Additional aspects of the application (If there are additional aspects to the application please list in a separate table on an extra page and attach to this form.) Cl Refer attached schedule C] Not required IDAS form 1—Application details Version 4.1—4 July 2014
Page 3
2. Location of the premises (Complete Table D and/or Tabie E as applicable. Identify each lot in a separate row.) Table D—Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water). (Attach a separate schedule if there is insufficient space in this table.) | Street address and lot on plan (All lots must be listed.) J Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.) Street address Lot on plan Local government area description (e.g. Logan, Cairns) Lot Unit Street Street name and official Post- Lot no. Plan type no. no. suburb/ locality name code and plan no. i) 5 Banksia Avenue 4567 42 SP188268 Noosa Shire Council ii) iii) Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a separate row in the below table. Non-mandatory) Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s i) il) iit) Table E—Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient space in this table.) Coordinates Zone Datum Local government (Note: place each set of coordinates in a separate row) reference area (if applicable) Easting Northing Latitude Longitude [-] Gpag4 L] wese4 | other 3. Total area of the premises on which the development is proposed (indicate square metres) 1280 sm 4. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.) Detached Dwelling IDAS form 1--Application details Version 4.1—4 July 2014
Page 4
5, Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non- mandatory requirement) [-] No L] Yes—provide details below List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy) Building approval 10 March 2015 6. Is owner’s consent required for this application? (Refer to notes at the end of this form for more information.) [-] No LC] Yes—complete either Table F, Table G or Table H as applicable Table F Name of owner/s of the land We, the above-mentioned owner/s of the land, consent to the making of this application. Signature of owner/s of the land Date Table G Name of owner/s of the land [_] The owner's written consent is attached or will be provided separately to the assessment manager. Table H Name of owner/s of the land oO By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. nN Identify if any of the following apply to the premises (Tick applicable box/es.) Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table | On strategic port land under the Transport Infrastructure Act 1994—complete Table J In a tidal water area—complete Table K On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.) On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion) OOOOO0d Listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under the Environmental Protection Act 1994 (no table requires completion) Table | Name of water body, watercourse or aquifer IDAS form 1—-Application details Version 4.1—4 July 2014
Page 5
Table J Lot on pian description for strategic port land Port authority for the lot Table K Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable) 8. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc) No EL] Yes—ensure the type, location and dimension of each easement is included in the plans submitted Does the proposal include new building work or operational work on the premises? (Including any. services) . No | Yes—ensure the nature, location and dimension of proposed works are included in plans submitted 10. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the end:of this form, for more information.) : , No—go to question 12 [] Yes 41. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more. information.) L O No Yes—complete Table L and submit with this application the yellow local government/private certifier's copy of the receipted QLeave form Table L Amount paid Date paid QLeave project number (6 digit number (dd/mmiyy) | Starting with A, B, E, L or P) 9]03]15 E187221 12. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of the Sustainable Planning Act.2009? Ll C No Yes—please provide details below Name of local government Date of written notice given | Reference number of written notice given by local government by local government (if applicable) (dd/mm/yy) Noosa Shire Council IDAS form 1—Application details Version 4.1—4 July 2014
Page 6
13. List below all of the forms and supporting information that accompany this application (Include ail IDAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question does not apply for applications made online using MyDAS) Description of attachment or title of attachment Method of lodgement to assessment manager WD101C Site plan with driveway highlighted & referenced A3 copy X 3 copies A Proposed Driveway & Landscaping detailed plan A3 copy X 3 copies B Cross section through proposed driveway A3 copy X 3 copies 14... Applicant’s declaration oO By making this application, | declare that all information in this application is true and correct (Note: it is unlawful to provide false or misleading information) Notes for completing this form e Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application. Note, the assessment manager has discretion to accept an application as properly made despite any non- compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the Sustainable Planning Act 2009 Applicant details « Where the applicant is not a natural person, ensure the applicant entity is a real legal entity. Question 1 * Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of assessment. Where schedule 3 identifies assessable development as “various aspects of development" the applicant must identify each aspect of the development on Tables A, B and C respectively and as required. Question 6 ¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the . application. If a development application relates to a state resource, the application is not required to be supported by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state resource is a separate process and will need to be obtained before development commences. Question 7 e If the premises is listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to seek compliance assessment. Schedule 18 of the Sustainable Planning Regulation 2009 identifies where compliance assessment is required. Question 11 e The Building and Construction Industry (Portable Long Service Leave) Act 1997 prescribes when the portable long service leave levy is payable. e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. IDAS form 1—Application details Version 4.1—4 July 2014
Page 7
Question 12 « The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1997 requires the levy to be paid before a development permit is issued. ¢ Building and construction industry notification and payment forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qieave.qid.gov.au. For further information contact QLeave on 1800 803 481 or visit www.qleave.qld.gov.au. Privacy—The information collected in this form will be used by the Department of State Development, Infrastructure and Planning (DSDIP), assessment manager, referral agency and/or building certifier in accordance with the processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of the IDAS process or the provisions about public access to planning and development information in the Sustainable Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by Parliament. This information may be stored in relevant databases. The information collected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY Date received NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To Earthcert Reference numbers Council. | have been engaged as the private certifier for the building work referred to in this application Date of engagement | Name BSA Certification license number Building classification/s February 2015 Luke John QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if applicable.) Date receipted . . : Name of officer Description of the work mene project oo paid Date paid ad sighted who sighted the assessment form manager . E187221 $3 429.00 09 03 2015 The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. Department of State Development, Infrastructure and Planning PO Box 15009 City East Qld 4002 tel 13 QGOV (13 74 68) [email protected] www.dsdip.qlid.gov.au IDAS form 1—Application details Version 4.1—~4 July 2014
Page 8
Department of State Development, Infrastructure and Planning ' | . | against a planning scheme | | | (Sustainable Planning Act 2009 version 3.0 effective 1 July 2013) 13 JUL 2015 This form must be used for development applications for building work or operational aise against a planning scheme. | You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. For all development applications, you must: e complete /DAS form 1—Application details e complete any other forms relevant to your application e provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning Regulation 2009. This form must be used for building work or operational work relating on strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. This form can also be completed online using MyDAS at www.dsdip.qlid.gov.au/MyDAS Mandatory requirements de What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable boxes.) | Building work—complete Table A | Operational work—complete Table B Table A a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? New driveway b) Are there any current approvals associated with this application? (e.g. material change of use.) [] No x Yes— provide details below List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy) Building approval 10 March 2015 Great state. Great opportunity.
Page 9
Table B
a) What is the nature of the operational work? (Tick all applicable boxes.)
[_] Road works [_] Stormwater [_] Water infrastructure
[_] Drainage works [] Earthworks [| Sewerage infrastructure
C] Landscaping CE] Signage C] Clearing vegetation under the planning scheme
[_] Other—provide details | New driveway
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
[[] No [_] Yes—specify the number of lots being created
c) Are there any current approvals associated with this application? (E.g. material change of use.)
[] No [] Yes—provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
150020 (Reve Attarto ().0>, Wp.
| BY bore)
2... What is the dollar value of the proposed building work? : $ PART OF PAID
Corte de
_ (inc GST, materials and labour.)
=r
3. What is the dollar value of the proposed operational work? 4 ‘ $
_(Inc GST, materials and labour.)
Mandatory supporting information
4. Confirm that the following mandatory supporting information accompanies this application
Mandatory supporting information Confirmation of { Method of
lodgement lodgement
All applications involving building work or operational work
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are PK contimed
recommended scales) which shows the following:
e the location and site area of the land to which the application relates
(relevant land)
the north point
the boundaries of the relevant land
the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for ail lots)
® any existing or proposed easements on the relevant land and their
function
any access limitation strips
all existing and proposed roads and access points on the relevant land.
IDAS form 6-—-Building or operational work assessable
against a planning scheme
Version 3.0—1 July 2013
Page 10
A statement about how the proposed development addresses the local government's planning schemes and any other planning documents relevant to the application. | Confirmed A statement addressing the relevant part(s) of the State Development Assessment Provisions (SDAP). Confirmed Not applicable Applications for building work (including extensions and demolition that i Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are recommended scales) which show the following: e the north point e the intended use of each area on the floor plan (for commercial, industrial or mixed use developments only) e the room layout (for residential development only) with all rooms clearly labelled e the existing and the proposed built form (for extensions only) e the gross floor area of each proposed floor area. Confirmed CL) Not applicable Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are recommended scales) which show plans of all building elevations and facades, clearly labelled to identify orientation (e.g. north elevation). Confirmed Not applicable Plans showing the size, location, proposed site cover, proposed maximum Confirmed number of storeys, and proposed maximum height above natural ground level Not applicable of the proposed new building work. Plans showing the extent of any demolition that is assessable development. | Confirmed id Not applicable Applications for operational work involving earthworks (filling and excavating) Drawings showing: existing and proposed contours areas to be cut and filled the location and level of any permanent survey marks or reference stations used as datum for the works e the location of any proposed retaining walls on the relevant land and their height ® the defined flood level (if applicable) e the fill level (if applicable). Confirmed Not applicable Applications for operational work involving roadworks Drawings showing: ¢ existing and proposed contours * the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points e information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) © kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) ¢ edge of pavement where kerb is not constructed e position and extent of channelisation e location and details of all traffic signs, guideposts, guardrail and other street furniture ® pavement markings including details on raised pavement markers L] Confirmed Px Not applicable IDAS form 6—Building or operational work assessable against a planning scheme Version 3.0-—1 July 2013 is assessable development) y 2
Page 11
¢ catchpit, manhole and pipeline locations
e drainage details (if applicable)
¢ cross road drainage culverts (if applicable)
* concrete footpaths and cycle paths
e location and details for access points, ramps and invert crossings
e changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing: CO Confirmed
existing and proposed contours C] Not applicable -
drainage locations, diameters and class of pipe, open drains and
easements ,
manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
e inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: (_] Confirmed
e kerb lines or edge of pavement where kerb is not constructed C] Not applicable
¢ location and levels of other utility services where affected by water
reticulation works
pipe diameter, type of pipe and pipe alignment
water main alignments
water supply pump station details (if applicable)
minor reservoir details (if applicable)
conduits
location of valves and fire hydrants
location of house connections (if applicable)
location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing: | Confirmed
location of all existing and proposed services L] Not applicable
location of all existing and proposed sewer lines and manhole locations
location of all house connection branches
kerb lines or edge of pavement where kerb is not constructed
chainages
design sewer invert levels
design top of manhole levels
type of manhole and manhole cover
pipe diameter, type of pipe and pipe alignment
location of house connections (if applicable)
sewer pump Station details (if applicable).
Applications for operational work involving street lighting
Drawings showing: [_] Confirmed
location of all light poles and service conduits CO Not applicable
location of all other cross road conduits
type of wattage and lighting
any traffic calming devices
additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment
IDAS form 6—Building or operational work assessable
against a planning scheme
Version 3.0—1 July 2013
Page 12
details of lighting levels. Applications for operational work involving public utility services Drawings showing: any existing light poles and power poles any existing underground services details of proposed services alteration to existing services. | Confirmed L] Not applicable Applications for operational work involving landscaping works Drawings showing: the location of proposed plant species a plant schedule indicating common and botanical names, pot sizes and numbers of plants planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences the proposed maintenance period irrigation system details. C] Confirmed C] Not applicable Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use of information recorded in this form. OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. Department of State Development, Infrastructure and Planning PO Box 15009 City East Qid 4002 tel 13 QGOV (13 74 68) [email protected] www.dsdip.qid.gov.au IDAS form 6—Building or operational work assessable against a planning scheme Version 3.0—1 July 2013
Page 13
Address: PO Box 288 a . EarthCert° a Roma ss BUILOIN EarthCert G APPROVALS Fax: 07 5485 2384 Email: [email protected] ABN: 49162782014 www.EarthCert.com.au GENERAL CONDITIONS OF APPROVAL FOR BUILDING WORK Building approval number: 150020 Property address: 5 Banksia Ave Noosa Heads QLD 4567 Scope of work: Lot 12 SP 188268 New Dwelling and Pool 1. CURRENCY PERIOD The currency period is that stipulated in clause 2 of the attached Decision Notice. This permit will lapse if building work covered by this approval has not been commenced and or completed within the period specified. 2. MANDATORY INSPECTIONS REQUIRED AT THE FOLLOWING STAGES: Inspection Private Certifier Competent Person Footing - Excavation of foundation material and before footings are laid IY G Slab - After placement of formwork & steel for slab and before concrete is poured I¥! mi Frame - before cladding or lining is fixed to the frame M GB Reinforced masonry construction - before wall cavities are filled mi _t Final - at completion of all aspects of building work 4 |_| Fire Wall - before work is covered or enclosed a a Swimming pool fencing - prior to placing more than 300mm of water into pool vi Swimming pool final - at completion of all aspects of building work Mi i ul We require at least 48 hours notice when booking an inspection time. 3. EXCAVATION AND FILLING WORKS Building work on land having less than 15% slope must comply with the Development of Detached Houses for excavation and filling works; Extent of excavation (cut) and fill does not involve a total change of more than 1000mm relative to the ground level at any point. No part of any cut and/or fill batter is within 1500mm of any property boundary except for cut and fill involving a change in ground level of less than 200mm that does not necessitate the removal of any vegetation. Retaining walls are; no greater than 1000mm high, not constructed within 150mm of any allotment boundary, located wholly within the lot. All stored material is contained wholly within the site, located in a single manageable area that does not exceed 50m2, and is located 10m from any allotment boundary. Cut and/or fill batters do not extend over allotment boundaries; No contaminated material is to be used as fill; For excavation, no contaminated material is excavated or contaminate disturbed. Waste materials are not used as fill, including but not limited to: o Commercial waste; o Construction / demolition waste; o Garden / vegetation waste; o Industrial waste; Filling or excavation does not occur within 1.5m of any utility services (setbacks less than this will require approval from the relevant council department). 4, REQUIREMENTS FOR STEEP AND UNSTABLE LAND (MAROOCHYDORE SHIRE AREA ONLY) Building work on jand having a slope of 15% or more must comply with the Development of Detached Houses for Special Requirements in Relation to Steep or Unstable Land; Maximum underecroft height at the perimeter of the building to be 3m above Ground level or; Undercroft skirting or screening (eg. Timber battens) to be installed to the full height of any undercroft area higher than 3m above Ground level at the perimeter of the building. The extent of cut and / or fill associated with a Detached house or Display home is: 9 No greater than 50% of the site area, and Project No: 150020 www.EarthCert.com.au
Page 14
Address: PO Box 288
EarthCert° ve moc se
BUILDING APPROVALS Fax: 07 5485 2384
Email: [email protected]
EarthCert ABN: 49162782014
10.
11.
12,
13.
14,
www.EarthCert.com.au
o No greater than area of 500m, and
o Nogreater than 50m? {other than placement of topsoil); and
a Does not involve a total change of more than 1.5m relative to the Ground level at any point.
RETAINING WALLS
THIS ITEM MAY BE AN ADVISORY NOTE ONLY NOT A CONDITION
Retaining walls retaining cut or fill are to be no greater than ‘1m above natural ground level. Retaining walls exceeding 1m above natural ground level or
within 1.5m of another building, will require building approval and engineer structural certification
TIMBER DURABILITY
Timber used for retaining wall structures shall be Durability Class 1 with sapwood removed or preservative treated to H5, Softwood to be preservative
treated to H5. Certification to be provided to Certifier prior to issue of final statement of inspection.
SEDIMENT CONTROL
The builder shall, during the construction period, ensure that no sediment leaves the site. Retention devices shail be employed and maintained throughout
construction period.
SURFACE WATER DRAINAGE AROUND BUILDING
The external finished ground levels surrounding the slab must be graded to a slope of not less than 50mm over the first 1000mm fram the building in
accordance with BCA Figure 3.1.2.2. The appropriate slab height above the finished ground level and paving is dependent upon the height of the
overflow relief gully, the possibility from storm runoff and location of weepholes in the brickwork. The finished ground level is to be a minimum of 150mm
below the slab. All finished garden mulch and paving is to be kept below brickwork weepholes and not to compromise integrity of termite barrier.
EASEMENTS
No building work is permitted inside any easement without written consent from owner easement. BUILDER is to identify exact location AND extent of any
easement onsite prior to commencement any building work.
EXISTING COUNCIL SERVICES
All building work is to be located and constructed in accordance with Queensland Development Code Mandatory Part 1.4. All underground infrastructure
is to be accurately located by the owner and/or builder prior to commencing construction. If the infrastructure is found to be in a different location to that
shown on the approved plans you are instructed to stop all building work immediately and refer to matter to the Building Certifier.
SUB-FLOOR VENTILATION
The sub-floor space beneath the suspended floor of a building must be designed and constructed in accordance with BCA Part 3.4.1.2. The sub-floor
space is to be cleared of all building debris and vegetation, be cross-ventilated with evenly spaced ventilation openings and have not less than 400mm
clearance between the ground level and underside of the lowest framing member (bearer). Ventilation to be provided at a rate of not less than 6000mm2
per metre length of wall.
TERMITE CONTROL
The termite management system is to comply with BCA Part 3.1.3 and AS3660. Certification to be provided to Certifier prior to issue of final statement.
PREFABRICATED TRUSS, WALL AND FLOOR (WHERE APPLICABLE)
The prefabricated truss, wall and floor frame installation details including layout plan, fixing bracing details and any other relevant information supplied by
the manufacturer must be supplied to the Private Certifier at time of frame inspection. NOTE: If information is not available at time of frame inspection the
Private Certifier reserves the right to request an Engineer Certificate for framing and tie-down.
CONSTRUCTION OF SANITARY COMPARTMENTS
Sanitary facility to comply with BCA Housing Provisions Part 3.8.3. The door to a fully enclosed sanitary compartment must: open outwards, slide or be
readily removable from the outside of the compartment, unless there is a clear space of at least 1.2m between the closet pan within the sanitary
compartment and the nearest part of the doorway.
Natural ventilation must be provided to sanitary compartments must be provided by either permanent openings (5% of floor area of room) opening to
Project No: 150020 www.EarthCert.com.au
Page 15
Address: PO Box 288 EarthCert® reba BUILDING APPROVALS Fax: 07 5485 2384 Emait: [email protected] EarthCert ABN: 49162782014 15. 16. 17. 18. 19. 20. 24. 22. www.EarthCert.com.au space open to the sky. Where natural ventilation is unable to be achieved mechanical ventilation is to be provided in accordance with AS1668.2. Certification to be provided to the Certifier prior to finalising the approval. MECHANICAL VENTILATION Mechanical ventilation must be installed to the internal rooms as noted on the approved plans in accordance with BCA Housing Provisions Part 3.8.5. and AS 1668 Part's 1 & 2. An exhaust fan or ather means of mechanical ventilation may be used to ventilate a sanitary compartment, laundry or bathroom provided contaminated air exhausts - 4. directly to outside the building by way of ducts; or 2. into a roof space that - © is adequately ventilated by open eaves, and/or roof vents; or ois covered by roof tiles without sarking or similar materials which would prevent venting through gaps between the tiles. WATERPROOFING WET AREA Wet areas within the building must be waterproof or water resistant in accordance with BCA Vol 2 Part 3.8.1 and complying with AS3740 and installed by a BSA licensed installer. TANKING OF HABITABLE AREAS All steps in floors where retaining walls have been installed or where retaining walls are used as external walls of habitable space are to be waterproofed by an approved tanking system and installed by a BSA licensed installer. STAIR CONSTRUCTIONS Stairs must be constructed in accordance with BCA Housing Provisions part 3.9.1. Stairs are to have a maximum of 18 risers; Stepped quarter landings must not have more than three winders; Riser openings must not allow a 125mm sphere to pass through between treads, Riser dimension 115mm min - 190mm max; Going dimensions 240min - 335 mm max; Slope Relationship (2R+G) 550mm min -700mm max. All dimensions within the stair flight must be constant throughout. BALUSTRADES Where the change in level from floor of balcony to ground level or floor level below is greater than 1000mm to balconies, access paths and lands or the like, the balustrades are to be constructed in accordance with BCA Housing Provisions Part 3.9.2. The balustrades must be constructed so that any opening does not permit a 125mm sphere to pass through it and for stairs the space is tested about the line of the nosing. Balustrade heights must comply with the following minimum requirements: @ 865mm above the nosing of the stair tread; 1000mm above the finished floor level; For floors greater than four (4) metres above ground the balustrading or other barrier between 150mm and 760mm above the floor must not facilitate climbing. All steel wire balustrading must be designed and constructed in accordance with BCA Housing Provisions part 3.9.2.3 (f), Tables 3.9.2.1 and Table 3.9.2.2. Balustrades must be designed and constructed in accordance with BCA Part 3.9.2.4a and Part 3.9.2.5 GLAZING All glazing in buildings must comply with the requirements of BCA Housing Provisions 3.7 and AS1288 (As amended). SMOKE ALARMS Smoke alarms must comply with the requirements of BCA Housing Provisions Part 3.7 and AS3786 (As amended) and be connected to consumer mains power. Smoke alarms to be located between all bedraoms and remainder of dwelling and, installed on all levels. Smoke alarms must comply with BCA Part 3.7.2.2(m)(d) where there is more than one alarm. SUSTAINABLE HOUSING MEASURES Building work to be constructed in accordance with the requirements of Queensland Development Code MP4.1. Certification to be provided to certifier prior to issue of final certificate. Project No: 150020 www.EarthCert.com.au
Page 16
Address: PO Box 288 EarthCert° ee BUILDING APPROVALS Fax: 07 5485 2384 Email: [email protected] EarthCert ABN: 49162782014 www.EarthCert.com.au Energy efficient fixtures - buildings to have energy efficient lighting for a minimum of 80% of total fixed internal artificial lighting. New air-conditioners to have an EER of at least 2.9. Water conservation - All shower roses to have a minimum 3-star Water Efficiency Labelling and Standards rating. All toilet cisterns to have a dual flush function and minimum 4-star Water Efficiency Labelling and Standards rating and are compatible with the size of the bowl to allow for proper functioning of the toilet. Tap-ware has a minimum 3-star Water Efficiency Labelling and Standards rating for taps serving laundry tubs, kitchen sinks and basins 23, ENERGY EFFICIENCY This approval must comply with the requirements of BCA 3.12 Energy Efficiency. 24, | REFERENCE CORRESPONDENCE Reference correspondence from for: 25. PLUMBING AND DRAINAGE COMPLIANCE ASSESSMENT Please contact the Relevant Council to carry out Plumbing & Drainage inspection in accordance with the Plumbing & Drainage Act 2002. 26. CERTIFICATES The following certificates (Form 15, Form 16) must be submitted prior to the development approval being finalised: Surveyors Setout Certificate Underslab Termite Certificate Perimeter Termite Certificate Truss Certificate Manufacturers Frame Certificate Window Glazing Certificate Shower Glazing Certificate Builder's Advice (Energy Efficiency and Sustainability) Wet Seal Certificate Smoke Alarm Certificate A Form 16 set out certificate is to be supplied by a licensed surveyor and a Form 16 to be supplied by a RPEQ engineer Project No: 150020 www.EarthCert.com.au
Page 17
3dAL INOwvaNs
SONIAYEC CBvONWIS
i wr
fy osd-y Oss AVRGASO WILNZOISEY “ON NOISWO GNYISNIINO: FE
a SAVAIAUQ ‘VITVEISAY ONRERNION3 SH8OM IMGNd JO BINLUSNI f
Toemse soydudea aq Aq paldope asap mao 308
“aimen Geecigund ng cxceg wolsipanes mPa oy oy HieeD Bee uy JP ag nau po yee
= yoma yo wndap yw
qax potas OS - O94 Guysa yno nog
/260109
eos
epUR Sy Veet] | eeore’y | o0)Ns ppoy
a
I 8 2 I wedyoo} I
Ig 2
I aad I
‘aos 0809 i 1 B=] | | \
f2b0109 i I t bose — 2] CH) NNVAD 0 LNaANI
0st I je ue 5 woud 30NviSIO
7aAO OH won (uy NNW 20 1eGAN
= °
@ 8 a $ SAOBY HOH
*
*
GAL Ii aa — V-¥ Ni IS
x0w OP set; Burpy puog.
SNOILYOOT OSLIGIHONd AVMSAlaO
“poos Papmypun UO wo DUE Gia poo Opis my 40
oud BR PUD eUNaweD pods UW ay}
ISUBI BUY YO 4D ‘POO PIAPINP © LO
volpaur ay] 10 Jal a0 x, paYOW sjuIOd ays
“Seqjauz u) aio suDisuawh ‘SoypuMpUs UI SUOISURWLID Ly “St
FO68E S¥ vO p9909 “ouy anay : smu 2p0i6 busy b ua fe poekas sassopa
© uy UuoYs svogosd] poyANCLg = me ele uo man foamed saavopnunie i *
yOIdITIOND 3} 9 2} UAOdIoo} Suns
. . w7IMO_ 020] 3yy 40 oxasddo
sav woo) [Ic tt 94] uodn payor aq few yuIOAsUCD spy “[yonuDW aBouNG vogI PudsuaeND) — HONE | sANOWaI
WAND 40 yowsupbas sed 50 anlesas poo) 21n uagua paulDoD st sOPOMULIOTS 3
fasnsea 01 Gray so Yaaur aa0qo wuNNSZ Jo JulDd YoY O sAalIDO YSeW BkORSAUG +4 “ZL 88
“papmy Ain} puo gi ui | 10 apoxb “xour az
_- Ol — 39 0} a20yns jounjou o) Aowanup yo abpe wou) SuaNEG MY Pua I> SpOYO “1) 85:
"Waunoys sed pPaONASUO? aq 0} Ss3D20 aUH “O) P g A
- *SUOLITS $5032
adh, eb200 30; sbumesp propuns Sone [0301 29 soup 6
Suojjoaboxé 0} Joud S903) v 2 >
30 posudda Guypnpuy ‘ysun0g woxy paweygo aq ysaw 2 eer? .
“SUORINUSY! Sses}D0MUOW 0B} YOROYD|SuI ‘psdoqud yoojnuosb 3 = i
passaxdwoa RT WWOL 1 “(eWi/EA OS] — Sg) w90) auaKineKod 38! |? WY
PayUy $8099 [29 PROD Uidap [ny DOREY WO! eq O} SW}! UO}SUDdK —“z aii ls ~
: “sBynarp yoaloud 0/2) 2s 2 -
‘ypydto 20 sx00;9 Giysad ‘se70U99 ~zuoyonASUED 10] OUD paresddy “9 2
PI YS wos; “OSE 4190; do; “s2K99 a6pe PuD Co} OS “HOLT S¥ OF SUGDE jreUMEVOUBY —°~S Ss 4 wh
33002081) wW9"t p>y cunt SY, PH SECL Sy jm sounpienso x4 ZoN WDE -¥ Z
OS Ogres 3743 ui wo
shousnsp 10) patow] —payaodusoa yan 2q [snus s}as0u00 cuuelee syaactpee MNed}oD4 “coyood sbcan 6
94 Jou WK sunguany Bud syiodjony syooU0> yr}Ou 0] Aosseoay avaye A104 0) wonDas ypodjooy 2 —«S9O-H OAS SMP DG Lense oy Lrousouy puo
aq yodlos yooxthy poor seOMAS “SyoNDA JURVEWRLED 20) paubrsep JOU 20 SUSE)“ wojsusdeo Poona MO TaqStO quay Jono 0
SHON S3ION agoqune=Ww29g
| www.noosa.qid.gov.au_| [email protected]
| ABN: 97 969 214 121
Postal address: PO Box 141 Tewantin QLD 4565 | Tewantin office: 9 Pelican Street Tewantin QLD 4565
T (07) 5329 6500 | F (07) 5329 6501
Page 18
re ee re ee er ere QLEAVE LEVY NUMBER
NOTIFICATION AND PAYMENT FORM
FORM BCi 10 V7
E187221
This form is issued in accordance with the Building and Construction industry (Portable Long Service Leave) Act 1991 s67(1), s76(2) and s77(1).
PO Box 512 Lutwyche Qid 4030 FREECALL PH 1800 803 481
A.B.N. 89 586 619 186
PART 1 PAYER DETAILS
Te ACA
Wa 4
das the payer lodged a notification with QLeave previously? YIN : N : Ifyes, please insert customer number if known (Contact QLeave).
1
Ino, leave blank
ayers Legal Name BRETT LEAHY
ayers Trading Name SHORELINE CONSTRUCTIONS PTY LTD Contact Person (FULL NAME)
‘applicable} BRETT LEAHY
ayer ABN 75130762873 Contiict Daytime ‘Phone No.
‘epoca 0412705972
ostal Address 12 PALM AVE , COOLUM BEACH Post Code 4573
NOTE: QLeave will typically correspond with the party named as the Payer in this section, Correspondence may include: letters, invoices and refun
PART 2. BUILDING AND CONSTRUCTION DETAILS
Description DWELLING
ra Plan No. bocal NOOS Certifier
Site Address _5 BANKSIA AVE, , NOOSA HEADS Post Code 4567
singe you 30/03/2015 conpicton 30/09/2015
Qwner JOHN NICKEL & JOHN DUNN
?rincipal Contractor (PC) (if appointed) - Refer to Instructions for definit
1C Legal Name BRETT LEAHY
xincipal Contractor ABN 7 5 13 0 7 6 2 8
PC Phone No. 0412705972
Customer Type: State Gov Local Gov Other
OFFICE USE ONLY yp x
(Refer to Instructions) BC Type: Other Res Commercial Civil Minesite
Ifthe work is fully covered by an QBCC, ALeave must be notified of
the work but ro payments rec in {OB PERMIT Number is provided on NUINBER tf applieabicy OB
Notification for Building and Construction work more than
$ 150000 $ 721,928
EXEMPTION CATEGORY $0
C Leviable Cost of Work (C= A- B) (Exc. of GST) $ 721,928
D Levies Payable (At time of lodgement) Refer to information on website for levy rates $ 3,429
[$902.41 [BCTF 100 | $721.93 [PLSL 250 | $1,804.66
a e@=aeci-ee\iage WHS 125
. Rel Jo BUT Tei eet Cenem cel Ul MER SORRELL ed
ART 4 DECLARATION ee eee correct fo the best of my knowledge and belief.
Name BRETT LEAHY Date 9/03/2015 Signature
PART 5 PAYMENT SLIP
*ayers Name BRETT LEAHY
E187221
hone No. 0412705972
Levies Paid $ 3,429
AILV/00047-16 Privacy Statement - QLeave is collecting the information on this form for the purposes of administering the Building and Construction Industry (Portable Long Service Leave) Act
1991, as required by that Act. QLeave may give some or all of this information to various other Government departments and agencies, as required or permitted by law.
GREEN - PAYERS | FVIFS ASSFSSMENT AND PAYMENT COPY
Page 19
Development Counter
13 JUL 2015
SP188268
C }02.03.15 | ISSUED FOR CONSTRUCTION | JD
B_|26.01.15 | ISSUED FOR TENDER 0
A {24.10.14 | ISSUED FOR INFORMATION JO
S rev | dete anenement oy
rer
2509 2534 | prope
ai DUNN/NICKEL HOUSE
LOT 12/5 BANKSIA AVENUE NOOSA HEADS
traving
‘SITE PLAN
ead fie
&
zi
is 2514
¥6
& |f
eB +2475) Sy
2508
t L ale
| 2 1: 200 @ 3
2/5
tlie 2. a ‘aate ‘erating
e ~ NIE 24 OCTOBER 2014 ADarchitectural.com
75 eas wy TEL: 0755343084
'S 252: a ape vant an
Powe ‘
ty
AREA COMPUTATION 5020 a 10:014 woior |B
oe ahead 2 Sa Sa
| j ]
ACTUAL FSR 206.09 SQ.M. ns ! a ro
\ | Pm
GROUND FLOOR 206.09 SQ.M. | TOTAL AREA 295.20 SQ.M. (1 SITE PLAN |
\WD}101/ SCALE: 1:200
GARAGE 40.29 SQ.M. ee
| PORCH 12.62 SQM. CODE COMPLIANCE
POOL & SUN TERRACE 56.41 SQ.M. BY CODE | ACTUAL
DRYING AREA 10.49 SQ.M. | Site Coverage 0.00% 16.09 % |
DECKING @ HOME OFFICE 5,30 SQM. | Allowable FSR | 000% | _ 23.06% s eget
Page 20
6 © | ORE, * x z 1 B Lccuee oe teCrnD | he (9) Box Tee [eoartila] ge reson @Ocovervs eee Cevieriva] pt — © write tere [rachwa | iw Ba Bane int Crus @ A et -- P| iN, 1h. fPespovto : ey ©) Pith AFied BUSeSRIA oar] SS we 4 rAnUY, : > —— oi tit Foe venice * ki b __Rivee ae ASAE ” usw) _ a @) ) po 4 apo , Cn)? BKUKE(A AVENUE ©) Devetuny PART PUBL.
Page 21
Used in these records
OPW15/0122 Application for Vehicle CrossoverRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.