Council archive · source document
SPCC03617211 · OPW11/0301
Attached to the e-mail Concurrence Agency Response from DERM.
DERM Permit number: SPCC03617211 CONDITIONS General 4. All works are to be constructed in accordance with the approved drawings and the specifications as detailed on these drawings. 2. If acid sulphate soils are found to be present through testing of areas subject to excavation in accordance with the requirements of State Planning Policy 2/02, then the works must be managed to prevent acid sulphate soil development as outlined in the current version of the Queensland Acid Sulphate Soils Technical Manual Soil Management Guidelines. 3. The disturbance to the bed and banks of the waterway is to be kept to a minimum. If as a result of any works, any bank is displaced the permit holder shail restore the bank to its original condition and take such other action as is necessary to ensure the stability of the bank to the satisfaction of the chief executive. Construction 5. All construction works on the jetty are to occur during times which would minimise sediment and contaminant dispersal. 6. All excavated material shall be transported to an appropriate location outside of the Coastal Management District. 7. Any material or any debris that falls or is deposited outside of the alignment of the works shown on the approved plans must be removed within 48 hours following placement of the material. 8. All temporary works associated with the construction of the works are to be removed from the site at the completion of the works. 9. All wastes shall be collected and disposed of at an appropriate lawful facility. Water Quality 410. Construction of the works are to be carried out only by means of suitable plant and equipment and measures are to be taken to limit turbidity in tidal waters as a result of the construction. 41. All reasonable and practicable measures must be taken to prevent pollution of the waterway as a result of silt run-off, oil and grease spills from machinery, concrete truck washout and alike. Wastewater from cleaning equipment must not be discharged directly or in-directly to any watercourses. 12. If there are any signs of sediment loss, a filter fence or other erosion device to contain sediment contaminated water and prevent contamination of tidal waters, is to be installed and maintained until completion of the works. Stormwater 13. Stormwater drainage systems are to be constructed to include quality improvement devices (sediment removal, gross pollutant traps) to ensure that stormwater can be effectively managed and discharged without causing adverse impact on the wetlands adjoining the subject land. Demolition 14. All demolition materials that are to be removed shall be transported to an appropriate location outside of the Coastal Management District or other approved location. Page 3 of 7 * 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPCC03617211.pdfRelated documentApplication case desk ↗
About this file
- File size
- 421 KB (small file)
- File type
No other editions are linked here.