Original source · versioned page text
SCG 31131-C-2021.09.14.pdf
.26
15
WM
WM
Telstra Pit
Elec Pillar
.26
15
WM
WM
Telstra Pit
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Elec Pillar Title:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — At
www.dialbeforeyoudig.com.au
DIAL1100
BEFORE YOU DIG
5 WM,
Telstra Pit
Ns we
WM &
6.100
AALS,
no
WM &
> WM b>
SITE PLAN — B99 & MRV VEHICLE EXIT PATHS
Scale 1: 250
Telstra Pit
6.100
/
De" 7 = ——_
7 inl = ileum Pig Vehicle
SSSA L SL PZ.
/
SITE PLAN — B99 & MRV VEHICLE ENTRY PATHS
Scale 1: 250
MRV — Medium Rigid Vehicle
Overall Length 8.800m
Overall Widt 2.900M
Overall Body Height 3.633m
Min Body Ground Clearance 0.428m
Track Width 2.500m
Lock—to—lock time 4.00s
Curb to Curb Turning Radius 10.000m
[— —_9.2 4
ES
+ — —
bal sor
B99 Vehicle (Realistic min radius) (2004)
Overall Length 5.200m
Overall Widt 1.940m
Overall Body Height 1.878m
Min Body Ground Clearance Q.272m
Track Width 1.840m
Lock—to—lock time. . 4.00s
Curb to Curb Turning Radius 6.250m
Revision | Description Date
May SR SR
5 tom Checked: Drg No. Rev.
1:250 @ Al S|
"4500 @ AZ| SRehardsn |) | ST131 -C4.1
Iss
* FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 299
a Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
Title:
VEHICLE MOVEMENTS PLAN
Project
89-93 Eumundi Noosa Rd,
NOOSAVILLE
Date: nA Drawn Design
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131-C-2021.09.14.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.