 Attachment 1—Conditions to be imposed
 No.         Conditions                                                   Condition timing
 Development Permit for Material Change of Use of Premises
 Schedule 7, Table 3, Item 12 – Regional plans

 And:

 Schedule 7, Table 3, Item 2 – Development impacting state transport Infrastructure,
 Department of Transport and Main Roads
   1.    Development must be carried out generally in accordance       Prior to the
         with the following plan/s and report/s, except as modified    commencement
         by these concurrence agency conditions:                       of use and to be
         Planning Report: Development Application for Material         maintained at all
         Change of Use for an Industrial Business (type 2) to          times.
         Establish a Soft Drink Factory within an Existing Building:
         at 271 Lake Macdonald Drive, Lake Macdonald QLD 4563,
         Lot 2 on SP108094 Prepared for: Noosa Beverages Pty
         Ltd, By: Adam + Sparkes Town Planning + Development,
         dated: September 2013 revision B
 Development Permit for Material Change of Use of Premises
 Schedule 7, Table 2, Item 23 – Contaminated Land, Department of Environment and
 heritage Protection
   2.    If during any site earthworks or excavation, offensive or     Ongoing
         noxious odours and/or evidence of gross contamination
         are observed, site works are to cease in that area and
         immediate action taken to abate the risk or environmental
         harm caused by the contamination. The administering
         authority is to be notified of the observation of any
         offensive or noxious odours and/or evidence of gross
         contamination not previously deterred, in writing, and with
         two (2) days.

             Any investigation or remediation works must be planned
             and supervised by a person who meets the requirements
             of s564 of the Environmental Protection Act (EP Act)
             1994. Upon completion of any remediation works, a
             validation report, completed in accordance with the
             National Environmental Protection Measures 1999 as
             amended (NEPM), must be provided to the administering
             authority. The validation report must conclude that the
             site is suitable for the intended use and, if appropriate,
             be accompanied by a draft site management plan for
             consideration by the administering authority under the EP
             Act.




 Department of State Development, Infrastructure and Planning                   Page1

Used in these records

About this file

File size
52 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Concurrence Agency Response MCU13_0171.pdf · 52 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.