Original source · versioned page text
MCU10/2083 Development Application part 2 - Attachment 5 - Traffic and Transport Assessment Report
Traffic & Transport Assessment -
Estimated Future Road Network Traffic Demands
6.3 Future (2022) Base Case Traffic Demands
In order to determine the traffic impacts of the proposed development on the surrounding road
network over the 10 year planning horizon, an annual growth rate of 2% has been applied to all
traffic volumes for a period of 12 years (i.e. 10 years beyond anticipated project completion date of
2012). The estimated 2022 base case traffic volumes are presented in Figure 6-3.
THOMAS ST
THE COCKLESHELL
261
595
304
10
34
18
89
25
6
0
6
850
3
0 GIBSON RD
15 3
830 10
5
25
0
85
0
0
0
0 528
29
SUBJECT KEEL CT
SITE
SKIPPER PL
Figure 6-3 Estimated Future (2022) Base Case Peak Hour Traffic Volumes
CTLRNO_r01_v02_FINAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.