Council archive · source document
05/1189 & 06/2232 - Change to Development Approval [As Published] · 142006.2232.02
C A L I ¥ Unii 19, Kunda Business Park PO Box 8208 Gordon Clements Nominees Pty Ltd 24 Hoopers Road Maroochydore DC trading as Calty Constructions CONSTRUCTIONS Kunda Park Qld 4556 Qld 4558 ABN 76 054 119 489 CeCe A) 26" August 2008 Sunshine Coast Regional Council Attn: Ms Kerri Coyle ew ndeS ty Kor, 251% PO Box 141 TEWANTIN QLD 4565 RE: Request to change an existing approval DP: 20060252 “Da’Vos” - 201 Gympie Tce, Noosaville Coloured finish of footpaths in Thomas St and Gympie Terrace. Dear Ms Coyle On behalf of Widewater Investments P/L and as per our discussions, | request a change to the existing development approval in the form a colour change of the exposed concrete aggregate footpaths in Gympie Terrace and Thomas Streets. At the present time, the driveways of the complex are being constructed using a Grey coloured exposed aggregate and | request approval to continue using the Grey colour in the footpaths surrounding the complex to achieve a level of uniformity, instead of using the ‘Pink’ colour as originally proposed. You may be aware of a plan by Energex to ‘underground’ the powerlines along Gympie Terrace in the not too distant future? As part of our request for a colour change, | also seek your approval for us not to install an exposed aggregate footpath along Gympie Tce at this time but construct an interim Grey concrete footpath with a ‘broom finish’. After Energex has dug up the footpath and laid the underground powerlines, | propose (at Developer’s cost) to make good the footpath with the Grey coloured exposed aggregate concrete at that time. We would also be happy for the Council to hold a $10,000 bond until such time that the exposed aggregate footpath has been completed. { look forward to your response. Yours faithfully Gordon Clements Director - Widewater Investments Pty Ltd CC: Ross Sanderson - Sunshine Coast City Council *==**o ~ Ross Aste Richard Foster - Foster Designs Fax: 5448-1415 (..03 wily Calty - For Superior Construction Outcomes Where Quality Is The Lasting Impression
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
05/1189 & 06/2232 - Change to Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 316 KB (small file)
- File type
No other editions are linked here.