Council archive · source document
06/1354 - MCU - Dwelling House & Lot Recon [As Published] · 132006.1354
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 Novernber 2005
Form 1 Development Application idas
IDAS Assessment
Checklist
(Formerly the "Referrals Checklist")
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerty referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Mines, Queensland Heritage Council etc.).
r ] 3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4. Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
§. __ Itis the responsibility of the applicant to accurately complete this checklist.
6. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
7. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
8. Toassist you in answering the following questions a series of guides are available free from www.ipa.qid.gov.au.
9. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au,
10. Section 2 provides advice about the referrals that can be required for applications for building work assessable against the Standard Building Regulation 1993 (SBR).
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for buitding work assessable against the Standard Building Regulation 1993 (SBR)).
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
in more “me ee, teat i (Ci) an environmentally relevant activity (ERA) for which a code for environmental compliance
Inless you answered “none of the above" to Q1, the .
applicaton requires assessment by the . has not been made - complete Part G of Form 4 ; ;
administering authority’. Di (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
It an entity, other than the administering authority, is Made - complete Part G of Form 1
the assessment manager for the application, the oe
@ administering authority is a concurrence agency for & (iii) none of the above
the application in relation to this matter,
Note: An application involving ERA 19 and/or 20 will
also require completion of Part Kr of Form 1 for
approval where an allocation under the Water Act
2000 is required.
State-controlled road matters 2. The application involves: (tick applicable box/es)
Unies os revert href dove to Q2, the (1 (i) development on land contiguous* to a State controlled road and for -
application or reerallo the Renainent a LD (a) material change of use assessable against the planning scheme;
In certain circumstances DMR will be an advice Ci (b) reconfiguring a fot untess -
agency, while in other circumstances DMR will be a « the total number of lots is not increased; and
concurrence agency.
« the total number of lots abutting the State-controlled road is not increased;
(CC (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)}-
associated with access to a State-controlled road; or
« for filling or excavation; or
* involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
jon refer to Guide 6 ‘Does my application trigger the referral coordination process?’
3° The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local goverment (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries {for a delegated ERA).
4 Land contiguous to a State-controfed road Is defined In schedule 14 of the IP Regutation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1354 - MCU - Dwelling House & Lot Recon [As Published]Related documentApplication case desk ↗
00157E36.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.