Skip to the record
For the highest quality transcripts.

Council archive · source document

06/1354 - MCU - Dwelling House & Lot Recon [As Published] · 132006.1354

of 60

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Operational work below high water
mark

For more information refer to Guide 18, For more
information about prescribed tidal work in local
goverment tidal areas refer to Guide 24.

‘Unless you answered "none of the above’ to Q10,
the application triggers referral to Queensland
Transport (QT) (Maritime Safety Qid) as a
concurrence agency.

Local government is the assessment manager for all
prescribed tidal work,

IDAS Assessment Checklist, Version 15.0, 18 November 2005
The application involves operational work that is: ( tick the applicable box/es)

( (i) tidal work'3 as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

D Gi) tidal work that is prescribed tidal work'4 - complete Part P of Form 1; oF
O (iti) carried out within a coastal management district's under the Coastal Act and for -
C1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part

M of Form 7;
(2 (b) reclaiming land under tidal water - complete Part M of Form 1; or
Ov)

constructing a canal"s, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
(iv) none of the above.

 

 

 

 

 

Coastal management 11. The application involves: (tick the appiicable boxes)
For more information refer to Guide 18, LC (i) a material change of use assessable under a planning scheme involving operational
Untess you answered ‘none of the above” to Q11, 7 i Fetrintl5.
the application requires assessment by te work carried out completely or partly in a coastal management district
Wironmental Protection Agency (EPA). C1 (ii) a material change of use assessable under a planning scheme involving building
It an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
manager for the application, EPA is a concurrence . . .
‘agency for the application in relation to this matter. « the construction of a new premises with a GFA’ of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
O (ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C1 (iv) reconfiguring a lot'® assessable under schedule 8 of the [PA and in connection with
the construction of a canal"® - complete Part M of Form 1
£1] (v) none of the above
Development within the limits of a 12. Does the application involve development below high water mark'9 and within the limits of a port
port under the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For ® NO
information about prescribed tidal work refer to
Guide 24. (C1 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Ifyou answered "YES" to Q12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
© within 200m of a shipping channel or an enty
and exit shipping corridor for the port
e within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds,
© within 1000m of a planned port facility identified
in aland use plan approved under the Transport
Infrastructure Act 1994,
In ail other situation the Port Authority is an advice
agency,
Marinas 13, Does the application involve operational work that is tidal work for a marina®° with more than 6
For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed
tidal work refer to Guide 24. The local government & NO
is I prescribed tidal i ibed ti
cone assessment manager fr all prescribed tidal (YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Ifyou answered “YES" to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidal) 14. Does the application involve tidal works within a strategic port land tidal area‘?

areas

For more information refer to Guide 18.

Unless you answered “NO" to 014, the relevant Port
Autharity is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT) are
concurrence agencies for the application.

 

NO
YES - complete Part M of Form 1

 

13 Tidal work Is defined In sch 10 af the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or parily within a local government tidal area.

15 Coastal management district is defined in sch 10 of the PA and means a coastal management district under the Coasta! Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act

16 Canal means canal as defined under the Coastal Protection and Management Act 1995

17 GFA is defined in sch 14 of the IPA to mean the gross floor area, For a definition of how fo calculated GFA, go to the planning scheme against which the application is being assessed.

18 Under 117 of the Coastal Protection and Management Act 1995, an apptication for reconfiguration, where the reconfiguration Is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.

20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.

Page 4

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1354 - MCU - Dwelling House & Lot Recon [As Published].pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.