Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

06/1354 - MCU - Dwelling House & Lot Recon [As Published] · 132006.1354

of 60

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

awe

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

Land owner's consent (if applicable)

Section 3.2.1(3} of the IPA prescribes that an
application must contain, or be supported by, the
written consent of the land ownerfs, if the application
involves:

() a material change of use;

(li) reconfiguration of a lot;

(Wi) work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995;0r

(¥) work on rail corridos land defined under the
Transport Infrastructure Act 1994,

Section 3.8.1{2}(a) of the IPA provides that

landowners consent is nof required for a mobile or

temporary ERA .

For more information refer to Guide 1.

20.

Land owner's consent to the making of this application:

 

Signature

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry materia! on State coastal land under the Coastal Protection and Management Act 1995)?

resource entitlement be given for applications that

involve a prescribed State resource. KINO - go to 024 (71 YES - go to a22

Section 3.2.1(40)(a)(j) of the IPA prescribes that . ee . .

appkcton re to be nopety ae 22. This application is accompanied by evidence: (tick applicable box)

west eens of the pele entitlement, (1 (i) of the allocation of, or entitlement to, the resource — attach evidence and go to 23(vi)

Refer to schedule 10 of the integrated Planning (1 (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence ii i i i i -
rele bythe Stale in euppot of he todging ofthis development is consistent with an allocation of, or entitlement to, the resource - go
development application. . o . . _ . . .

O (ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23

Advice for completing Q23 23. Evidence of the resource entitlement:

The Information in (i) - (v} is mandatory if evidence i : . . , ‘i ;

te te so fe evidences (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable)

application involves any water or riverine quarry (i) Name of delegated officer

material under the Water Act 2000.

Section 3,2.1(5A) allows the resource manager to limit

the time the evidence may be used. Q23 (vi) must be (iii) Position of delegated officer

(iv) Signature of delegated officer

(v) Date

(vi) pes date of evidence —

Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?

This checklist does not apply if the applicati i ti

the completion oP, a aon 8 at heFomoniy i I Yes LINO - the assessment manager may refuse to accept this application on the
must be completed for all other apptications. grounds that the application has not been property made

Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

An application shoutd be accompanied by details to
support the proposal & enabie the assessment
manager, referral agancies and any person viewing
the application during public scrutiny or public
natification to understand the scope of the proposal
and any potential impact

 

 

 

 

 

Plan / Drawing / Report Number Title Date
Application for Development
Permit for Material Change of
{i) _ Planning Report 38411 prepared | Use ( 2 Detached Dwellings ) June 2006
by Murray & Associates (Qid) Pty Ltd and Development Permit for u
Reconfiguration of a Lot ( 2 Lot
Residential Subdivision )
Plan of Proposed
(ii) | Proposal Plan 38411-1e prepared | Reconfiguration & Material 11/5/2006
by Murray & Associates (Qld) Pty Ltd Change of Use of part of Lot 21
on RP839106
(iil)
(iv)

 

 

 

 

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1354 - MCU - Dwelling House & Lot Recon [As Published].pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.