Council archive · source document
51998.2462.03 - Amended Change to an Existing Approval
Officer: Jack Lewis Direct Telephone: 07 53296236 Our Reference: 51998.2462.03 Your Reference: N/A 16 February 2016 Noosa Blue Management P/L TTE C/- RG Strategic PO Box 1363 NOOSA HEADS QLD 4567 Dear Sir/Madam Amended Change to an Existing Approval Sustainable Planning Act 2009 I refer to your request to make a permissible change to an existing approval.. On 6 January 2016, Council decided your requested changes. This amended decision notice has been issued to correct a previous error relating to the lot numbers applying to the development. Details of the decision are as follows: application details Application No: 51998.2462.03 (TC12585) Street Address: 16 Noosa Dr NOOSA HEADS QLD 4567 Noosa Blue 400/16 Noosa Dr NOOSA HEADS QLD 4567 Noosa Blue 500/16 Noosa Dr NOOSA HEADS QLD 4567 Real Property Description: Lot 207 SP 120748 Lot 509 SP 120748 Planning Scheme: The Noosa Plan (16 September 2013) Decision details Council on 1 June 1998 issued a Town Planning Consent Permit, subject to conditions. In relation to a request for a minor change the approval, Council on 25 November 1998 agreed to change Conditions 1, 2, 3 and 30, and include 4 additional conditions. In relation to a request to for a minor change to the approval, Council on 6 July 2004 agreed to: A. Approve the plans titled Pergola Plan numbered WD02.00 and Section numbered WD03.00 prepared by DesignInc Brisbane dated 05/02/04 and may be amended by these conditions. B. Include three additional conditions In relation to the request to make a change to the existing approval, Council on 6 January 2016 decided to: A. Approve a change to Condition 1 B. Include additional Condition 53 relevant period of approval The relevant period for this development approval is in accordance with that stated in the Decision Notice/Negotiated Decision dated 1 June 1988, unless an application to extend the period is approved by Council under s 383 of the Sustainable Planning Act 2009. CONSOLIDATED ASSESSMENT MANAGER CONDITIONS Submission to and approval by Council of building plans in accordance with the Building Act, Council's By-laws and Policies, the conditions of this approval and substantially in accordance with plans numbered:- For Lot 4 - WD-07E, 07AE, 08E, 09E, 10E, 11E, 13E, 15E, 17E, 18D, 30E, 31D, 32D, 34D and 34aD, prepared by Noel Robinson Architects and dated July, 1998 and; For Lot 12 - DA - 04, 05, 11 and 12 prepared by Noel Robinson Architects and dated March, 1998; Plans titled Pergola Plan numbered WD02.00 and Section numbered WD03.00 prepared by DesignInc Brisbane dated 05/02/04; and Plans titled Manager’s Unit Extension & Night Office dated, 19/11/2015 prepared by RG Strategic and the Shire of Noosa Planning Scheme apart from where amendments are required or dispensations have been granted in conjunction with this approval. 2 The plans submitted for Building Approval are to comply with the following requirements:- No spa baths are permitted at the roof top level. Spas must be spa pools only. Adequate provision for people with disabilities as required by the Building Code of Australia. Smoke detectors in each unit. Fire Hydrants to be installed as required by State Fire Services. No roofing or other means of covering is permitted over the rooftop terrace level. (Pergola structures are permitted). Access to this area shall be by means of staircases from the balconies of the units below. No roofing is permitted of the “Breezeway” area. The two bedroom unit proposed on Lot 12 must not be let as two units and must be designed accordingly. The storage area above the Manager’s unit, shown on drawing WD-18D is to be deleted. The design of the Porte Cochere must have a clearance of 4.1 metres over the driveway, to allow for the passage of refuse vehicles. The vehicle hire premises/airconditioning building is to be roofed in a design sympathetic to other roof structures proposed for the site. The developer is advised to meet with Council’s Building Department staff, prior to lodging an application for a Development Permit for building works. 3. Provision of at least 104 off-street carparking spaces, comprising 102 covered spaces and 2 uncovered spaces, and access thereto which are to be provided with a sealed pavement and designed, drained, constructed and maintained in accordance with the Planning Scheme, Australian Standard 2890.1 1993 edition, Council's Policies and to the reasonable satisfaction of the Shire Engineer. Plans and specifications for these works are to be submitted to the Shire Engineer for approval in conjunction with the Building Application. In this regard, a grease/oil arrestor is to be installed in the wash down bay to ensure that polluted run off does not enter Council’s stormwater drainage system. A Building Approval shall not be granted until the Shire Engineer has approved of the carparking and access scheme. All carparking designs and grades shall conform with Australian Standard 2890.1 1993 edition. The pavement and kerb below the Porte Cochere is to be widened to improve the capability of this area to allow for two vehicles to park under the Porte Cochere and for the passage of vehicles over the remainder of the driveway. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. No pile driving is permitted to be undertaken on Lot 12 on RP 122292 (fronting Natasha Avenue). The construction work force shall be directed to park their vehicles in an area nominated by the Shire Engineer. The developer shall comply with any reasonable directions from the Shire Engineer, in regard to compliance with this condition by contractors involved in the construction. Parking and off loading of vehicles for construction purposes shall be carried out in accordance with the requirements and directions of the Shire Engineer. During the construction period, building materials, plant, etc shall not be stored on any footpath so as to cause a nuisance to pedestrian traffic. All directions from the Shire Engineer on this matter shall be complied with. Any crane operated on the site for a period of more than five (5) days shall be powered by electric motors only. Staff of the complex are to be permitted to park on site in specially marked bays. The management of the complex and the operators of the conference centre and vehicle hire premises are not to direct staff to park off site. The proposed conference centre shall be sound proofed to the satisfaction of Council’s Building Surveyor and the Department of Environment in accordance with applicable statutory requirements but in any event so that the noise level produced by activities carried on within the boundaries of the site, shall not exceed 45dBA when measured at the boundary of the site or 5dBA above ambient background noise levels again when measured at the boundary of the site, whichever is the higher. No amplified music or entertainment involving amplified noise shall be permitted in the conference centre after 10.00pm on any night. No carparking areas are to be used for purposes (including any temporary storage of goods or equipment) other than carparking. No hire vehicles are permitted to be displayed for hire purposes or otherwise parked in the Noosa Drive road reserve, adjacent to this site or the driveway within the site. Any vehicles left in that road reserve area by customers returning the vehicles, shall be immediately removed to within the site by the operator of the vehicle hire premises. All pool pumps and servicing equipment shall be located away from nearby residential buildings on adjoining sites and shall be adequately soundproofed. The open space and setback areas are to be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping is to be completed in accordance with the approved landscape plan, prior to the premises being occupied and maintained at all times thereafter to the reasonable satisfaction of the Shire Planner. No clearing is to take place until the landscaping plans are approved. The developer shall also undertake landscaping works in the adjacent footpath area. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. The landscape plans referred to above are to denote areas of existing vegetation or existing trees proposed to be retained. In particular, the existing trees in the vicinity of the common boundary with the “Caralina” units site, shall be retained where those species accord with Council’s Landscaping Policy. Construction work and other associated activities are permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where extended hours are approved by the Building Surveyor. Any advertising sign or device is to comply with the provisions of Council's policies on advertising. All separate, adjoining lots that form part of this application are to be amalgamated into one undivided lot, prior to the issue of a Building Approval. Payment of contributions in accordance with Council's Policy on Water Supply and Sewerage Headworks. Please note that the headworks charges will alter in accordance with Price Index variations or if any amendment is made to Council's policy. Headworks contributions shall be calculated and paid in accordance with either of the following alternatives:- Payment to be made prior to the issue of a Building Approval in the amount calculated under the Policy at that date; or Payment may be deferred to a date:- prior to Council sealing plans of the development for titling purposes; prior to the issue of a Certificate of Classification for any building approved under this application; or prior to commencement of the approved use at the relevant premises; whichever is the sooner. Payment of deferred headworks contributions shall also be subject to the following requirements:- Submission of a trading bank guarantee to the value of headworks assessed at the time prescribed by the Local Government (Planning and Environment) Act 1990, plus 20%, prior to Building Approval; Headworks shall be calculated as the value of headworks assessed at the time prescribed by the Local Government (Planning and Environment) Act 1990, plus interest charged at the rate set by the Queensland Treasury Corporation for Local Government borrowings as they apply to Noosa Shire. The interest rate used shall be the rate current at the "time prescribed" above; Should the contributions not be paid at the due time, Council shall call upon the security lodged; and in the case of a building permit, if a permit expires the securities held will be returned. 21. Construction of roadworks, drainage and footpath improvements across the full frontages of the development to the satisfaction of the Shire Engineer. Such works shall involve the construction of kerb and channel, bitumen widening, associated drainage, hot mix correction to the existing pavement, where required and footpath upgrading works. The developer will be required to construct frontage works in Noosa Drive in accordance with the proposed Hibiscus Avenue/Noosa Drive roundabout and Council Plan No. 8438 for the proposed upgrading of the Noosa Hill traffic layout. To determine the required layout, the developer’s consultant is to liaise directly with Council’s Engineering design staff. In this regard, plans prepared by a registered Civil Engineer are to be submitted to and approved by the Shire Engineer, prior to the issue of Building Approval. The developer shall contribute an amount of $85,000.00, which is estimated to be half the cost of construction of the Hibiscus Avenue/Noosa Drive roundabout, estimated at $170,000.00. Such an amount shall be paid, prior to the issue of a Building Approval. The footpath across the Noosa Drive frontage of the site is to be upgraded by the provision of a 1.2 metres wide concrete footpath and the landscaping of the remaining area to the standards and requirements of the approved landscaping plan. The applicant is to contact Council's Engineering Department to determine the footpath alignment prior to the commencement of any works. A meandering footpath is desirable. The developer is to provide for a geotechnical report which addresses the depth and extent of excavations, associated earthworks and proposed methods of construction. This report is to be prepared by a registered civil engineer and submitted for appraisal by Council’s nominated geotechnical consultant and for approval by the Council Building Surveyor. A certification shall be submitted by the Developer’s structural engineer, with a check certificate from an independent firm of structural engineers, confirming the adequacy of the structure to preform to conditions on the site to the satisfaction of the Building Surveyor. The developer shall be responsible for the control of erosion and sediment export from the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. The applicants shall be required to submit an Erosion and Sediment Control Plan with the Building Application. This plan is to be approved by the Development Engineer, prior to the issue of the building approval. 25. The developer shall bear the cost of alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site. 26. Connection to Council's existing water supply and sewerage reticulation systems at the developer's expense to the standards and requirements of Council's Shire Engineer. 27. The developer is required to redirect all sewerage which currently is connected to the Council manhole located at the south western boundary of the site (MH NH05/32/04) to the sewer manhole located on the western boundary of Lot 4 on RP 122292 (MH05/18/02). A plan outlining these works is to be submitted to Council for approval by the Shire Engineer. All works and connections are to be completed to Council’s Engineering Standards and to be paid for by the developers. 28. The developer shall provide metered water connections from the water supply system to the proposed development, in accordance with Council's standards and to the satisfaction of the Shire Engineer. 29. Roof and surface water is to be collected on site and is to be discharged into existing drainage located in the streets below the subject site. The developer shall investigate the capacity of the existing drainage system and any upgrading required shall be at the developers expense. A Building Approval shall not be granted until the Shire Engineer has approved of the drainage scheme. Prior to the submission of an application for Building Approval, the developer is to investigate the adequacy of Council’s existing stormwater drainage system to cope with additional runoff from the proposed development. In this regard, a report prepared by a registered Civil Engineer is to be submitted to and approved by the Shire Engineer, prior to the issue of a Building Approval. Any works recommended in the approved report, are to be constructed at the developer’s expense, to the satisfaction of the Shire Engineer. The stormwater collection system shall ensure that there is no unreasonable discharge of stormwater into the site of the “Caralina” units adjoining the subject site. 30. Submission of two (2) sets of professionally drawn scale plans in compliance with Council’s Code controlling food establishments and bar for approval by Council’s Environmental Health Officer, for any food premises proposed to be included in the development. Approval is to be obtained prior to fitting out the building. 31. An annual licence is to be obtained under the Food Hygiene Regulations of 1989 from Council’s Health Department. 32. Provision of approved refuse containers in accordance with requirements of the Refuse Management Regulations of 1983 for the storage and collection of refuse to the satisfaction of Council’s Environmental Health Officer. 33. Provision of an imperviously paved area to accommodate all refuse and recycling containers to the reasonable satisfaction of Council’s Environmental Health Officer. This area is to be aesthetically screened from any road frontage or adjoining property boundary and is to be set back a distance of two (2) metres from any road frontage. A suitable hosecock, hoses and approved drainage outlet to Council’s sewer, are to be located in the vicinity of the refuse container area for washing containers. 34. Any flat or unit intended to be let out for fee or reward is to be licensed annually with Council’s Health Department in accordance with the provisions of Chapter 43 of Council’s By-Laws prior to such letting. 35. The swimming pool shall be licensed annually with the Council’s Health Department in accordance with the provisions of Chapter 42 of Council’s By-Laws. 36. Provision of separate toilet facilities for patrons, in addition to staff toilet facilities in accordance with the Building Code of Australia. 37. Comply with provisions of Trade Waste Policy and obtain a Permit to discharge Trade Waste for the conference facility. 38. As of March 1997 this development will be subject to an Approval under “Part 1 - Preliminary, s.2 (5) of the Environmental Protection (Interim) Regulations of 1995. This approval will be required for Environmentally relevant activities of Schedule 1 s.38 and s.39, as shown below:- Land development and construction activities 38. Land Development - clearing (other than for agricultural purposes) or reclaiming land having an area of more than 20,000m² 39. Construction of premises or engineering structures - constructing or demolishing - (a) residential premises (other than a class 1 or 2 building, containing not more than 2 dwelling units, or a class 10 building, under the Standard Building Law) or commercial or industrial premises .......................... (b) bridges, roads or other engineering structures (other than roads, bridges or other engineering structures on rural properties used for primary production or road maintenance or repairs ................................. Any applicant submitting a building application for an above mentioned environmentally relevant activity as of 1 January 1997 shall concurrently submit an application for approval to Council’s Health Department. 39. Additional Condition Airconditioning units shall be located in a manner which prevents noise disturbance beyond the subject land. 40. Additional Condition From the 31 January 1999, a requirement will exist to apply under the Environmental Protection Act (EPA) for an approval to undertake the development of building works (both construction or demolition) for residential purposes in excess of two dwelling units. 41. Additional Condition All liquid waste produced by the non-residential section of the development is to be treated as required under the Noosa Trade Waste Policy and to the satisfaction of Council’s Trade Waste Officer, prior to release to the sewer. Approval of the Trade Waste requirements is to be obtained by the developer, prior to the issue of a Development Permit for Building Works. 42. Additional Condition The electrical sub-station indicated adjacent to the Noosa Drive frontage of the site on drawing WD13E, is not approved in that location. The sub-station must be located a minimum of 1.0 metre from the property boundary and a 1.0 metre minimum landscaped area is required in this part of the site. 43. All plant associated with the conference facilities and vehicles hire business shall be situated within the building and shall be located as to prevent noise disturbance beyond the subject land. 44. Waste water from the vehicle hire wash area shall be discharged to Council’s sewer and not to stormwater and a trade waste permit is required. In this regard, a grease/oil arrestor is to be provided in the car wash. A Building Approval shall not be granted until the Shire Engineer has approved of the drainage scheme. 45. The footpath and setback areas are to be kept clear of goods, signs and street furniture not approved by Council. 46. Where S.E.Q.E.B. require provision of a transformer, a pad mounted transformer, together with access is to be located on site to the satisfaction of S.E.Q.E.B., the Shire Engineer and Shire Planner. The transformer is not to be located within landscaped areas unless approved by the Shire Planner. 47. Submission of a cash bond or trading bank guarantee to the sum of $100,000 to secure performance of conditions, prior to the issue of Building Approval. The cash bond or trading bank guarantee will be returned upon performance of the conditions of approval, except for a sum of $10,000 that shall be retained for a period of 12 months after the use commences to ensure compliance with conditions for that period. 48. The provisions of this approval are to be effected, prior to the commencement of the approved use. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. 49. The development approved under this permit, may not start until the developer has obtained the following associated Development Permits:- Development Permit for building works. Development Permit for plumbing and drainage works. Development Permit for operational works of landscaping, carparking and access. Development Permit for reconfiguring a Lot. Additional Conditions 06/07/04 50. Existing trees located along the southern and eastern peripheries of the pool area are to be retained. 51. The roofed area is to remain for the exclusive use of guests using the swimming pool, pool bar and associated facilities. 52. Prior to the commencement of development, the following Development Permits must be obtained:- Development Permit for Building Works Additional Conditions 06/01/16 53. The caretaker accommodation indicated on the plans titled Manager’s Unit Extension & Night Office dated, 19/11/2015 prepared by RG Strategic must be used for management purposes only and not for visitor accommodation purposes. referral agency conditions Not Applicable advisory notes Infrastructure Charges (Applicable to Change to an Existing Approval dated 6 January 2016) This Development Permit for a Change to an Existing APPROVAL will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted Charges). property notes Not Applicable PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable further development permits required Not Applicable self assessable codes Not Applicable submissions Not Applicable reasons / grounds for appoval Not Applicable rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. other details If you wish to obtain more information about Council’s decision, electronic copies of which are available on line at www.noosa.qld.gov.au, or at Council offices. DECISION NOTICE HISTORY Original Decision Notice 25 November 1998 Change to an Existing Approval – 28 November 1998 Change to Conditions 1, 2, 3 & 30 and include additional Conditions 39,40,41 & 42 Changes to an Existing Approval 6 July 2004 Approve Plans WD02.00 & WD03.00 and include additional Conditions 50, 51 & 52 Changes to an Existing Approval 6 January 2016 Change to Conditions 1 and include additional Conditions 53 Yours faithfully Jack Lewis Development Planner Encl. Appeal Rights Amended Infrastructure Charges Notice (Rev1) cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7) 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. [word/footer1.xml] Page 2 of 11 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 11 [word/header3.xml] 51998.2462.03
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
51998.2462.03 - Amended Change to an Existing Approval.docxRelated documentApplication case desk ↗
About this file
- File size
- 90 KB (small file)
- File type
- DOCX
No other editions are linked here.