PO31 Extractive industry No acceptable outcome provided Not applicable
operation areas are fenced to
prevent unauthorised or
accidental public entry.
PO32 Development does not No acceptable outcome provided Can comply with PO32
compromise the stability, safety or
operation of infrastructure.
PO33 Development is designed No acceptable outcome provided Can comply with PO33
and managed to minimise the risk
and impact of any accidental spills
or releases of chemicals and other
materials that may contaminate
soil, stormwater, groundwater or
air.
Landscaping No acceptable outcome provided Can comply with PO34
PO34 Landscaping complements Refer Landscape Plans.
biodiversity values in the
surrounding area.
Rehabilitation No acceptable outcome provided Can comply with PO35
PO35 Rehabilitation of the site,
over the life of the project and on
its completion:
1. provides progressive/ staged
rehabilitation works;
2. includes appropriate
clean-up works (taking
particular account of areas
of possible soil or water
contamination);
3. results in a stable final
landform;
4. provides suitable drainage
and hydraulic conditions;
and
5. achieves a suitable degree of
revegetation consistent with
potential post extraction land
use.
PO36 Rehabilitation allows for No acceptable outcome provided Can comply with PO36
suitable use of any water storage
created through the extraction
process, having regard to water
quality, hydraulic conditions, land
form and vegetation.
PO37 Rehabilitation works for No acceptable outcome provided Can comply with PO37
each operational stage are
bonded to ensure the effective
34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.