Mr David Milligan, W Donald Milligan Pty Ltd                                   29 November 2013
Re: Response to Sunshine Coast Regional Further Information Request of 19 November 2013 – Noise,
      Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                               L26013/BH/12-002



Development approvals for poultry farms typically include a condition requiring the
implementation of a Site-Based Environmental Management Plan (SBEMP) prior to
the commencement of use. This Site-Based Environmental Management Plan
should specify management measures to minimise the risk of odour nuisance from
the spreading of litter, such as:

•   Spreading of litter within 4 to 5 weeks of clean-out from the poultry sheds to
    ensure that odour emissions from the spreading of litter do not coincide with peak
    odour emission periods from the next batch of birds in the poultry sheds.
•   Litter from each batch to be spread in a distributed manner across the
    orchard so as to not concentrate odours to a particular boundary of the site. The
    applicant has advised that the available litter from the poultry sheds will not be
    sufficient to spread over all areas of the site in a year i.e. not all areas of the site
    will be covered in a year.
•   Maintaining spreading areas at a minimum setback of 50 metres from the
    southern, eastern and northern property boundaries to minimise potential
    near-field odour influences on adjacent properties. This will provide a minimum
    buffer distance of 300 metres from spreading areas to a residential dwelling.
•   Spreading of litter only when prevailing winds are from the northeasterly to
    southeasterly sector as required to minimise odour transport from the spreading
    process.
•   Use of appropriate low velocity spreading equipment to minimise release of
    dust (and associated odours) into the atmosphere.
•   Dampening of applied litter during high wind speed periods to minimise
    potential fugitive dust (and odour) emissions.
•   Corrective actions in the event of odour nuisance, including:
        •   Review of spreading locations, methods and practices to identify measure
            to reduce impacts; and
        •   If necessary, export of litter from site if noted to generate excessive odour
            emissions.

With the available 300 metre separation distance from spreading areas to
surrounding residences it is considered that implementation of the above
management measures in accordance with a SBEMP will ensure that the activity
does not cause unreasonable odour nuisance.

Yours sincerely




Ben Hyde
Environmental Engineer




                                               8
Log in to download the original file

2184Response_OM13_222.pdf · 11.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.