Original source · versioned page text
2184Response_OM13_222
Very large file: it may take a few minutes
The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
The Report recommends that a Condition of approval be imposed that requires the imposition of a Site-Based Environmental Management Plan (SBEMP); which includes details of the measures required for the spreading of litter, the distribution pattern, boundary setbacks and time of spreading. 4. Water quality management particularly addressing potential impacts from the use of shed waste and composting material for fertilising the orchard and any associated run off. The litter is composted within 3 bunded areas; 300 lineal metres within a 120m x 22.5m bunded area: a reserve area of 76 lineal metres in a 82m x 14m bunded area and a further reserve area of 110 lineal metres in a 75m x 14m bunded area. Each batch will create approximately 1030m% of litter/compost; it is planned to spread the compost for a depth of 0.1m for a width of 5m under the trees and landscaping. Therefore the compost from each batch will provide 2,060 lineal metres (2.06kms) of compost along the orchard rows or 12km of orchard rows per year. The orchard includes in excess of 50kms of orchard rows therefore the composting operation will only cover less than 25% of the total orchard rows per year. The orchard currently includes a vegetated buffer located along the watercourses and the spreading of the compost will only be undertaken within the orchard area; in accordance with the current farming practice. 5. Feasibility on reduction of size and number of sheds The applicant originally proposed the construction of 8 poultry sheds 160m long; which is the industry standard; during the process of the application and detailed design of the sheds and site the sheds have been reduced to average lengths of 105m. The applicant has also undertaken to adopt to RSPCA stocking density 17.2 birds per m?; therefore the maximum total number of birds possible at the site is 235,554. The Queensland Farming Manger of Inghams has provided written confirmation that most new facilities have a capacity of 240,000 birds and that a capacity of less than 200,000 may not be viable (Ref: Inghams Letter, 25/11/13 — Appendix E). This proposal allows for a maximum of 235,554 birds to be on site. The scale of this proposal is already reduced from what was envisaged at the concept stage when sheds with a length of 160m were considered. | trust that this information provides the additional information required for the assessment of the Development Application. Do not hesitate to contact this office if you require any further information. Yours faithfully Mb ‘Max Watterson
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.