Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Delegated Report - Code - Planning OPW22 0241 [As Published]

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

               DEVELOPMENT ASSESSMENT DELEGATED REPORT

               Author                  Coordinator Engineering, Mark Lewis
                                       Development Assessment



                    APPLICATION DETAILS

                    Application No.                 OPW22/0241

                    Applicant                       Robert Richardson & Linda Maree Richardson

                    Proposal                        Operational Works - Vehicle Crossover

                    Properly Made Date              26 September 2022

                    Information Request Date        11 October 2022

                    Information Response Date       15 December 2022

                    Decision Due Date               13 February 2023

                    Report Completed Date           13 January 2023

                    Report Reviewed By              Daniel Epps


                    PROPERTY DETAILS

                    Property Address                117 Woodhaven Way Cooroibah Qld 4565

                    RP Description                  Lot 26 RP 891766

                    Land Area                       4618.0000 m²

                    Existing Use of Land            Residential (Shed existing, dwelling under construction)


                    STATUTORY DETAILS

                    SEQRP Designation               Rural Living Area

                    Zone                            Rural Residential

                    Precinct                        Not Applicable

                    Local Plan Area                 Not Applicable

                    Overlays                        Acid Sulfate Soils, Biodiversity, Bushfire

                    Assessment Type                 Code

               1.      PROPOSAL
               The application seeks approval for Operational Works - Vehicle Crossover.
               The locality and proposal plan are included below.



Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023
Log in to download the original file

Delegated Report - Code - Planning OPW22 0241 [As Published].pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 9 pages

Page 2

                                       Figure 1 – Locality




                                                             Page 2 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023


[OCR of page images]
PC EEN
ret

a]

 

Figure 1 — Locality

Page 2 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

Page 3

                                       Figure 2 – Site Plan




                                                              Page 3 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023


[OCR of page images]
2 ,
—— Tree on foatpath

 

 

F—PowER POS 7. Sm% in fom boundary

4 Marts to cer

 

tre, of Dowenoy

Zor ab

 

j i 3mis To Boundey

PROPOSED Howe | é __Dawewhy 3-5 ete

   

 

 

 

e

1 Weoedraven

\——"_ Coor o\boh

 

 

Figure 2 - Site Plan

Page 3 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

Page 4

                                                   Figure 3 – Driveway Plan


               2.     SITE DETAILS
               2.1. Background
               The application was submitted because the proposed location required the removal of an existing
               street tree. The driveway is the first formed driveway to the property.
               3.     ASSESSMENT
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •      State Planning Policy;
               •      South East Queensland Regional Plan;

                                                                                                 Page 4 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

Page 5

               •       Planning Regulation 2017; and
               •       Noosa Plan 2020.
               3.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
               •       Driveways and Carparking Code;
               The application has been found to generally comply with all applicable statutory instruments.
               4.      CONSULTATION
               4.1. Referral Agencies
               Not Applicable
               4.2. Internal Council Referrals
               Not applicable
               4.3. Comments
               While the driveway may not directly impact the trunk of the tree it would significantly impact on the
               root system and if it were to remain it would significantly impact on the sight lines from the driveway.
               It is considered reasonable to remove the tree.
               In discussion with Council’s Environment Officer it was decided that a replacement tree was not
               required as it to would impact on sight lines.
               5.      CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No OPW22/0241 for Operational Works - Vehicle Crossover situated
               at 117 Woodhaven Way Cooroibah Qld 4565 and described as Lot 26 RP 891766, it is
               recommended the application be approved in accordance with the following details for the Decision
               Notice:
               1.      APPLICATION DETAILS

                   Application No:              OPW22/0241

                   Street address:              117 Woodhaven Way Cooroibah Qld 4565

                   Real property description:   Lot 26 RP 891766

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Operational Works - Vehicle Crossover
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




                                                                                                        Page 5 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

Page 6

               4.     ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                           Plan No.           Rev.     Plan/Document Name                   Date

                                                       Site Plan as submitted to Council on Undated
                                                       15 December 2022

                                                       Driveway Plan as submitted to
                                                       Council on 15 December 2022

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 13 January 2025, unless an application to extend the currency period
                      is approved by Council.
               SITE SPECIFIC CONDITIONS
               3.     The existing tree in the road reserve adjacent to the proposed driveway must be wholly
                      removed as part of these works
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               4.     All necessary approvals from external service providers (eg Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               5.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               6.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               7.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Other relevant parties
               8.     A Construction Management Plan must be submitted at least 5 working days prior to prestart
                      meeting and must address the following:
                      a.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD)
                      b.      provision for safe pedestrian and vehicle access across the frontage of the site both
                              during daily construction and after daily construction has ceased.
               9.     Any changes to the details associated with the Principal Contractor during construction, must
                      be notified to council in writing within five business days of the change occurring.
               10.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.




                                                                                                      Page 6 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

Page 7

               DURING CONSTRUCTION
                      Engineering
               11.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site
                      Pavement Design and Construction
               12.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer and must be certified by an RPEQ.
                      Works within Road Reserve/Reinstatement
               13.    Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               14.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               15.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Site Access and Driveways
               16.    Driveway crossovers must be constructed generally in accordance with council’s Standard
                      Drawings RS-049, RS-050 and any associated addendum
               17.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete.
                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties or create additional ponding of stormwater on the road
                              reserve.
                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway
                      Erosion and Sediment Control
               18.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               19.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties.

                                                                                                        Page 7 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

Page 8

               20.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               21.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               22.    Prior to the completion of the development and the final inspection, all site surfaces must be
                      effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term.
                      Damage to Services and Assets
               23.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION
               24.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with standard drawings.
               2.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the drawings has not been undertaken. The property
                      owner bears full responsibility for all aspects of the design. Council reserves the right to
                      require further amendments and/or additions at a later date should design errors become
                      apparent.
               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                                                                                                         Page 8 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

Page 9

                      Prestart and Inspections Request
               5.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days notice of preferred inspection time.
               6.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
                      Environmental Advisory Notes
               7.     The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               8.     Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
               9.     Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
                      Aboriginal Cultural Heritage Act 2003
               10.    There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If


                                                                                                         Page 9 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

Page 10

               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                    Page 10 of 10

Document Set ID: 22239937
Version: 4, Version Date: 16/01/2023

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.