Original source · versioned page text
Operational Management Plan - 5 Opal St, Cooroy - Crackerjack
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ○ Maintained and tested monthly in accordance with fire safety standards.
● Backup Systems:
○ Battery backup installed to ensure operation during power outages.
4.5 Energy Efficiency and Environmental Sensitivity
● LED Technology:
○ Energy-efficient LED fittings used throughout the venue.
● Timers and Sensors:
○ Automatic timers programmed to switch off non-essential lighting outside
operating hours.
○ Sensors used in staff-only areas to minimise unnecessary energy use.
4.6 Monitoring and Review
● Weekly Checks:
○ Staff conduct weekly perimeter inspections to ensure lighting operates
correctly and does not spill into residential areas.
● Complaints Handling:
○ Any lighting complaints from neighbours logged in the Complaint Register.
○ Adjustments made promptly to address concerns.
● Annual Review:
○ Lighting system reviewed annually for compliance with Council standards
and technological improvements.
5. Waste Management and Collection
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.