Original source · versioned page text
Operational Management Plan - 5 Opal St, Cooroy - Crackerjack
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ○ Incident report prepared by Duty Manager within 24 hours.
● Community Engagement:
○ For incidents affecting neighbours, management will communicate
corrective actions to residents.
7.8 Continuous Improvement
● Annual Review:
○ Emergency and Incident Management procedures reviewed annually.
● Feedback Integration:
○ Staff, community, and Council feedback incorporated into updates.
8. Monitoring and Compliance
Ongoing monitoring and compliance are essential to ensure Crackerjack continues to
operate within licensing conditions, community expectations, and Council requirements.
This framework provides a structured approach to audits, reporting, and community
engagement.
8.1 Noise Monitoring
● Hourly Perimeter Checks:
○ Duty Manager conducts hourly perimeter checks during evening trade.
○ Readings logged in Noise Monitoring Log (Appendix A).
● Sound Level Monitoring:
○ Calibrated sound meters used to measure indoor and outdoor music
levels.
○ Immediate corrective action taken if approaching compliance thresholds.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.