Original source · versioned page text
Response to Information Request - MCU12/0184
The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
),
~
:1
MAX WATTERSON+ASSOCIAT~S
CONSULTING SURVEYORS & PLANNERS
\ \o\t6~
(_.>J
S\II~\~i\ l~l \~\ijli\il \i\~
80667238
~
8th May, 2013
Ref: 06-2184
our Ref: JL013:JL:MCU12/0184
The Chief Executive Officer
Sunshine Coast Regional Council
Devt.: ~/" ~"\"Y"r\’’\t
)~...’ ’r...",!.
’J ~ r’ounter "’-J1
Locked Bag 72 1 .
SUNSHINE COAST MAIL CENTRE Q 4560
8 MAY 2013
Attention: Jack Lewis
Dear Sir, -,’ewantin
I refer to the above-mentioned matter and your letter of Information Request dated 10th
December, 2012 and I respectfully supply the following information:
1) Please find herewith 2 copies of detailed elevation and section plans prepared by
Callaghan & Toth (Ref: 1209-05, 1209-06, 1209-07, 1209-08, 1 March 2013), These
plans show the associated retaining walls, ’screening vegetation, external building
materials, colours and external lighting,
2) The flooring of the sheds is compacted soil with woodchips over the top and is
designed to prevent land and ground water contamination.
3) A Visual Assessment and Visual Amenity Assessment of the proposed development
has been prepared by Terra-Firma, which you will find enclosed (Ref: VA01 & VA02, 18
March 2013), This includes a photomontage of the proposed buildings from several
locations,
4) A Vegetative Ccreening Plan prepared by Terra-Firma has also been included, which
shows how the proposed landscaping will assist in screening the proposed sheds from
surrounding properties (Ref: LS01 & LS02, 18 March 2013).
5) An Integrated Stormwater Management Plan has been prepared by Callaghan & Toth ____
-......
which you will find attached herewith. This plan addresses the idsue of how stdrmwater
will be ma aged (Ref: STORMWATER
MANAGEMENT PLAN, April 2013),
,
( \ TREATMENT\\jAND WATER/QUALlT~
^
\-
\
6) Please also find enclosed
Stormwater Management Plan
a
that
Stormwater Impact Assessmrnt and Site Based
Ihas bben prepaced by Cal)a’ghan & Toth (Ref:
cJ
STORMWATER
TREf-TME~T A~D.lWAT~ QUALlT’S" MANA MENT PLAN, April
/\
PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252
Max L, Watterson
Cadastral Surveyor (Qld)
B,Surv(UNSW), M,S,S,S,I
~ PH
FAX
0754426121
0754425125
EMAIL [email protected]
~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.