Response to Information Request - MCU12/0184
The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 145, section 1. The text section number identifies this passage in the reader.
Geotechnical and Slope Stability Investigation
Treatment options to reduce to low risk should be implemented as soon as practicable.
The decision as to the level of risk to be accepted or tolerated needs to be considered by the owner,
consent authorities, insurance companies and other parties involved. The decision should be based on
a number of factors, not limited to: the cost of repair of structures, the legal ramifications of accepting
the risk, the effect of the consequences on people, and the future implications of damage to the
structure. Ultimately the decision to accept or remediate the risk is taken by the owner of the site. The
following section presents a summary of the slope stability hazards and a slope stability risk
assessment for the site.
7.5 Identification of Hazards
The proposed subdivision currently does not contain any building structures. For the purpose of this
assessment, it has been assumed that the future residential building development will comprise a
lightweight clad timber frame structure. The instability hazards judged to potentially present at this site
include:
1: Shallow failure in the footing zone of the future structure.
2: Deep failure through the weathered rock below the future structure.
3: Failure of engineered retaining structures or cut and fill batters on the site.
7.6 Property at Risk
The property at risk in this assessment is considered to be the permanent poultry sheds, water tanks
and hoppers described in Callighan & Toth drawing no, 1209-A1.
7.7 Results of Risk Assessment
The assessed likelihood and consequences of the three relevant hazards are presented in Appendix D.
A summary of the assessed risks are shown in Table 1.
The assessed risk as indicated in Table 1 assumes the recommendations regarding building
foundations and geotechnical structures in this Coffey report are followed. Where the
recommendations are not adopted, or only adopted in part, the assessed risk may be different to that
indicated in Table 1.
Coffey Geotechnics 5
GEOTKPAR01945AA1A
23rd April 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.