Original source · versioned page text
Response to Information Request - MCU12/0184
The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 170, section 1. The text section number identifies this passage in the reader.
coffey-o. geotechnics SPECIALISTS MANAGING THE EARTH
Job Number:
OffIce:
GEOTKPAR01945AA
Kunda Park
Sheet of
Dynamic Cone Penetrometer
Client w. Donald Milligan Pty Ltd Hammer Mass 9.1:1: 0.1 kg
Principal Hammer Drop 510 iii 600 0
Project 136 Top Forestry Road Cone iii Blunted 0
Location By: MC/CM jDate: 14/04/2013
Test Location: TP2 TP4 TPS 14 #5 Site Locatlonl
Depth(m) Remarks
0.1 4 2 3
0.2 3 3 3
0.3 3 2 3
0.4 4 1 3
0.5 B 2 7
0.6 5 B
I
0.7 3
0.8 4
0.9 5
1.0 5
1.1 6
1.2 6
1.3 6
1.4 R
1.5
1.6
1.7
1.8
1.9
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
Remarks:
Remarks:
L - Limit of Investigation
R - Refusal (morethan 30 blows in 100 mm)
B -
Bouncing (Refusal)
R (C) Refusal (Concrete)
-
PH:(07)54454952 FAX: (07)5445 3764
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.