PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY
QUALITATIVE MEASURES OFLIKELIHOOD
ApproJ:imate Annual Probability
Implied Indicative Landslide Leve.1
Description Descriptor
Indicative Notional Recurrence Interval
Value Boundary
10- 10 years The event is expected to occur over the design life. ALMOST CERTAIN A
5xlO-2 20 years The event will probably occur under adverse conditions over the
10-2 100 years LIKELY B
desi~n life.
5x10.3 200 years
10-3 1000 years The event could occur under adverse conditions over the design life. POSSIBLE C
2000 vears
5xlO-I Th.e event might occur under very adverse circumstances over the
10-4 10,000 years UNLIKELY D
desi2ll life.
5xlO-5 20,000 years
10-’ The event is conceivable but only under exceptional circumstances
100,000 years RARE E
over the design life.
5xlO-6 200,000 years
10’" 1,000,000 years The event is inconceivable or fanciful over the design life. BARELY CREDIBLE F
Note: (I) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.
QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY
Approximate Cost of Damage
Description Descriptor Level
Indicative Notional
Value Boundary
Structure(s) completely destroyed and/or large scale damage requiring major engineering works for CATASTROPHIC 1
200%
stabilisation. Could cause at least one adiacent property maior consequence dama~e.
100%
Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
60% MAJOR 2
stabilisation works. Could cause at least one adiacent property medium consequence damage.
40%
Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
20"10 MEDIUM 3
Could cause at least one adjacent property minor consequence dama~e.
10%
5% Limited damage to part of structure, and/or nart of site reQuirin~ some reinstatement stabilisation works. MINOR 4
1% -
Little damage. (Note for high probability event (AlmostCertain), this category may be subdivided at a
0.5% INSIGNIFICANT 5
notional boundary of 0.1%. See Risk Matrix.)
Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property whi.ch includes the land plus the
unaffected structures.
(3) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
(4) The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa
91 Australian Geomechanics Vol 42 No 1 March 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.