Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Response to Information Request - MCU12/0184

of 189

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 34, section 1. The text section number identifies this passage in the reader.

                                                                                ~
                                                                             Callaghan & Toth


         TABLE 3.2:         COMPARISON OF LOAD REDUCTIONS


             Parameter                               MUSIC       POLLUTANT
                                                 REDUCTION         LOAD
                                                     RESULT      REDUCTION
                                                                 TARGETS
             Flow                                     34%
             Total Suspended Solids                   78%          80%
             Total Phosphorous                        59%          60%
             Total Nitrogen                           53%          45%
             Gross Pollutants                         54%


3.3.2 Assessment of Results


The developed site has been modelled as a series of commercial sub-catchments, which
incorporate Water Sensitive Urban Design (WSUD)treatment trains. Plan No’s 1209-02 to
1209-05 shows the proposed locations of the rainwater tanks, bio-retention swales, basins,
swales and buffers. The reductions listed in Section 3.3.1 above do not comply for Total
Suspended Solids and Total Phosphorus targets. The TSS reduction of the proposed
treatment train is 78% which is within an 2.5% error of reaching the 80% target. Given that
the location of the chicken sheds is on the ridges of the property and treated stormwater
runoff exiting the treatment train still has to travel through vegetated areas (in the order of
100m to 500m) prior to reaching surface waters, i.e. onsite dams, Blackfellow Creek, etc, the
remaining suspended solids will be removed while travelling over the vegetated existing farm
land.


The Total Phosphorus result is a 59% reduction with the proposed treatment train and the
target is 60%,which is within an 2% error of reaching the 60% target. Again as the treated
stormwater runoff is travelling over 1 00m-500m through vegetated farm areas to reach
surface waters it is considered the small amount of phosphorus not removed in the treatment
devices will be treated in the onsite vegetated areas before entering local waterways.


Therefore, it is considered that the proposed stormwater treatment system is currently
sufficient to reduce the pollutants prior to exiting the site.




                                                                                         15
1209 Animal Husbandry   Top Forestry Rd, Ridgewood
                        -
                                                                                 SWQMP
April 2013
Log in to download the original file

Response to Information Request - MCU12_0184.pdf · 122 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.