Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Response to Information Request - MCU12/0184

of 189

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 73, section 1. The text section number identifies this passage in the reader.

       ~



{,.




      Catchment A +dam detention Q10 Coo noosa 10-Year Ouration=20 min, Inten=127.9 mm/hr
      Prepared by {enter your company name here}                                              Printed 24/04/2013
      [email protected] sIn 05328 @2011 HydroCAD Software Solutions LLC                                         Page 2

                               Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                                Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                      Reach routing by Stor-Ind method   -   Pond routing by Stor-Ind method


      5ubcatchment 25: Half catchment A         Runoff Area=56,815.0 m2    0.00% Impervious   Runoff Depth=37 mm
                                                             Tc=23.0 min    C=0.74    Runoff=1.29046 m3/s 2.105 MI


      5ubcatchment 65: Half catchment A         Runoff Area=56,815.0 m2    0.00% Impervious   Runoff Depth=37 mm
                                                             Tc=23.0 min    C=0.74    Runoff=1.29046 m3/s 2.105 MI


      Reach 4R: (new Reach)                                                           Inflow=1.90082 m3/s 4.176 MI
                                                                                     Outflow=1.90082 m3/s 4.176 MI


      Pond 4P: (new Pond)                 Peak Elev=125.255 m    Storage=0.685 MI     Inflow=1.29046 m3/s 2.105 MI
                                                                                     Outflow=0.95041 m3/s 2.088 MI


      Pond 7P: (newPond)                  Peak Elev=125.255 m    Storage=0.685 MI     Inflow=1.29046 m3/s 2.105 MI
                                                                                     Outflow=0.95041 m3/s 2.088 MI


               Total Runoff Area = 11.3630 ha    Runoff Volume = 4.209 MI      Average Runoff Depth 37 mm =


                                           100.00% Pervious     =   11.3630 ha   0.00% Impervious 0.0000 ha
                                                                                                      =
Log in to download the original file

Response to Information Request - MCU12_0184.pdf · 122 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.