Original source · versioned page text
Response to Information Request - MCU12/0184
The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 80, section 1. The text section number identifies this passage in the reader.
’
,
roof catchment Pre development Q10 noosa 10- Year Duration=6 min, Inten=208.9 mm/hr
Prepared by {enter your company name here} Printed 24/04/2013
HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC Page 2
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method -
Pond routing by Stor-Ind method
5ubcatchment 25: total roof area Runoff Area=14,653.0 m2 0.00% Impervious Runoff Depth=21 mm
Tc=6.0 min C=0.74 Runoff=0.63011 m3/s 0.306 MI
Reach 4R: (new Reach) Inflow=0.63011 m3/s 0.306 MI
Outflow=0.63011 m3/s 0.306 MI
Total Runoff Area = 1.4653 ha Runoff Volume = 0.306 MI Average Runoff Depth 21 mm =
100.00% Pervious = 1.4653 ha 0.00% Impervious 0.0000 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.