Original source · versioned page text
Response to Information Request - MCU12/0184
The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 86, section 1. The text section number identifies this passage in the reader.
,\
roof catchment Post development Q10 noosa 10-Year Duration=6 min, Inten=20B.9 mm/hr
Prepared by {enter your company name here} Printed 24/04/2013
HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC Page 4
Summary for Reach 4R: (new Reach)
[40]Hint: Not Described (Outflow=lnflow)
Inflow Area = 1.4653 ha,100.00% Impervious, Inflow Depth = 28 mm for 10-Yearevent
Inflow = 0.85149 [email protected] hrs, Volume= 0.413 MI
Outflow = 0.85149 [email protected] hrs, Volume= 0.413 MI, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
Reach 4R: (new Reach)
Hydrograph
I Inflow
I Outflow
-
fh
.,.
E
-
~
..2
u..
o 1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.