Original source · versioned page text
2016-08-09 Services & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 9 AUGUST 2016
Pomona – Rifle Street Flood Mitigation Works
Before works Completed works
2. Completed Projects
In addition to the above major projects, there were a significant amount of projects completed
throughout the financial year. Some of these include:
Whole of Shire Park Shelter Renewal
Whole of Shire Playground Refurbishment
Whole of Shire Park Furniture Renewal
Tewantin Splash Park, Playground renewal
Sunrise Beach Ben Lexcen stormwater pipe re-lining
Noosaville Tait - Duke Cottage relocation
Cooroy Belli Creek Road Timber Bridge deck resurfacing
Noosaville Noosa Waters Navigational Lock Renewals
Sunshine Beach NAC – 50m pool hydraulics report
Castaways Beach Beach Access 42 Renewals
Sunrise Beach Ben Lexcen Drive School Crossing Improvements
Whole of Shire Bus Stop Renewal Programme
Cooroy RV Stopover
Noosa Heads Transit Centre Lighting upgrade
Tewantin Doonella Street Jetty refurbishment
Noosa Heads Ravenswood Park, Public Jetty rehabilitation
Noosaville Eumundi Rd Landfill Concrete approaches to weighbridge
Tewantin Cooroy Noosa Road upgrade – stage 5
Noosa Heads Weyba Creek Embankment Protection
Page 127 of 148
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.