BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Building and Plumbing
Tait House relocation and renovation Water connection and below ground Design & quote new water supply If building stage is ready installation
drainage has been completed and above ground drainage of water supply and above ground
drainage to be carried out by
Building & Plumbing Services team.
Contract takeover of testing Council 107 Council owned devices annual Schedule lease holders & managers Next stage of program to be
owned Backflow Prevention Devices maintenance testing complete to arrange access for testing prior to developed for the testing of
next due date outstanding devices
Deliver audits of on-site facilities 577 letters sent to Cooran property Complete audits as per resident Provide further outcomes and data
programs owners requesting access for on-site response and collate data to Strategic Planning Team for use
waste water facility audit. Audits in developing on-site waste water
being carried out as per resident policies/requirements for Noosa Plan
responses
Pool safety activities 24 inspections carried out on Refine system and processes to Continue to develop swimming pool
swimming pools in response to meet legislative timeframes with complaints processes eg, staff
complaints and non-conformity pool safety training in infringement issue &
notices compliance processes
Develop and implement condition reports Tender has been accepted from Captured information and photos to Confirm all contract schedule
for Council owned buildings and Contractor to undertake 55 Council be entered into asset register requirements have been completed
structures owned buildings to Councils satisfaction.
Billing for work completed to be
undertaken to complete this stage of
program
Page 140 of 148
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.