Skip to the record
Every meeting, every word.

Original source · versioned page text

2016-08-09 Services & Organisation Committee Agenda

of 148

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                             9 AUGUST 2016


BRANCH ACTIVITIES         RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                            THE NEXT QUARTER
Pest Management
Vector Control               Fortnightly trapping project with           Finish light trap program for the           Continue light trap program for
                               Queensland Health to determine any            Aedes mosquito.                               Aedes mosquito through winter if
                               presence of the Aedes species               Monthly rat bait trap servicing across        required
                               mosquito that can carry Dengue                the district
                                                                                                                         Continuing assistance with animal
                               fever or Zika virus. No detections          Assisting the Pest & Contract Officer
                                                                                                                           and weed pest compliance, and
                             2015/2016 mosquito season had                 with weed inspections, pig trapping
                                                                                                                           surveillance work
                               less mosquito infestation compared            work and fox den identification work
                               to 2014/15 year.- 5 aerial treatments                                                     Commencement of aerial mosquito
                               (1020 hectares) vs. last year 7 aerial                                                      treatments and mosquito light
                               treatments.                                                                                 trapping work
                             Weekly light trapping caught 2743
                               mosquitoes total compared to 4971
                               last year. Ross River Virus
                               notifications = 82 this year vs. 119
                               last year. Barma Forest Virus
                               notifications = 7 vs. 13 last year.
WH&S                         Reviewed WH&S for firearm storage           No further action required
                               and Poison & Chemical
                               management at Pomona Depot
                             Completed firearm proficiency
                               training
                             Completed WH&S policy for staff
                               doing asbestos compliance work
Pest Control                 Established a prequalified supplier         Engagement of contractors to assist         Investigating the use of sniffer dogs
                               arrangement for pest control                  pest control programs. Required to            for fox den location
                               contract services                             replace a long term injured staff           Engage contractor to carry out den
                             Implemented wild dog baiting                  member.                                       detection
                               program                                     Fireweed management at Eumundi                Recruit casual pest control officer for
                             Trial of remote camera use with               road land fill                                to replace staff member on long term
                               email capability to enable camera           Complete 3rd quarter pest survey              work cover leave
                               activity updating from remote                 program
                               locations. This has resulted in             Ongoing roadside spray program
                               significant time saving when carrying       Wild pig control at Noosa Airstrip
                               out trapping programs (avoids on              North Shore
                               going trap inspections if not               Finalise arrangements with
                               required)                                     contractors for delivery of pest
                                                                             animal trapping services

                                                                               Page 77 of 148
Log in to download the original file

2016-08-09 Services & Organisation Committee Agenda(PDF, 7MB).pdf · 7.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.