Council archive · source document
Town Planning Report (rec. 16.04.25) · MCU25/0042
the risks to people and
property to an
acceptable or tolerable
level.
All natural hazard areas:
(4) Development supports
and does not hinder
disaster management
response or recovery
capacity and
capabilities.
(5) Development directly,
indirectly and
cumulatively avoids an
increase in the severity
of the natural hazard
and potential for
damage on the site or
to other properties.
(6) Risks to public safety
and the environment
from the location of
hazardous materials
and the release as a
result of a natural
hazard are avoided.
(7) The natural processes
and the protective
function of landforms
and the vegetation that
can mitigate risks
associated with the
natural hazard are
maintained or
enhanced.
State Interest – Strategic Airports and Aviation Facilities
A development application for: All of the following requirements The subject site is not located
(1) a material change of use of are assessment benchmarks: within close proximity to a
premises which will result in a (1) Development and strategic port.
building, structure or associated activities do
associated activity intruding not create a permanent
into the operational airspace or temporary physical
of a strategic airport; or or transient intrusion
(2) a material change of use of into a strategic airport’s
premises where any part of operational airspace,
the premises is within the light unless the intrusion is
restriction zone or lighting approved in
area buffer or a strategic accordance with the
airport; or relevant federal
(3) A material change of use of legislation.
premises where nay part of (2) Development and
the premises is within a associated activities do
wildlife hazard buffer zone not include light sources
of a strategic airport; or or reflective surfaces
(4) A material change o fuse of that could distract or
premises or reconfiguration confuse pilots within a
of a lot where any part of light restriction zone or
the premises is within a public lighting area buffer.
safety area of a strategic (3) Emissions do not
airport; or significantly increase air
(5) a material change of use of turbulence, reduce
premises or reconfiguring a visibility or compromise
lot where any part of the the operation of
P a g e | 11 TOWN PLANNING REPORT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report (rec. 16.04.25).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.