   FM – 6.3.5 Emergency Management Plan template


   4 Training

   RACV will ensure that all workers, including full time, temporary, casual, contractor workers and
   volunteers are trained and competent in fulfilling their role in an emergency situation. This
   section outlines the specific training details for each role.

   To ensure a consistent approach, RACV maintains an organisation wide Training Matrix which
   is to ensure a consistent approach, FM – 3.2.2 Training Matrix Template is accessible on
   CHARLi Health Safety & Wellbeing page.


    4.1 ECO Training

   The Property & Capital Works (PCW) Team manage the relationship with the training providers
   and will coordinate with each sites Emergency Planning Committee (EPC) to organise regular
   training for the Emergency Control Organisation (ECO) and ensure the building occupants
   participate in an emergency response exercise at least once in any 12-month period.

   The training program is delivered by a competent person as deemed by AS3745 on a minimum
   6 monthly basis, typically the training program entails:

       •   Evacuation Procedures
       •   Bomb Threat Procedures
       •   Fire Awareness
       •   Use of Fire Extinguishers and Hose Reels
       •   Any other training as deemed appropriate to reflect emerging trends or site-specific
           considerations.

   Typically, onsite training will be conducted on the day of an emergency or evacuation trial, and
   additional online training is available for EPC and ECO members.


    4.2 Occupants & Visitors

   A General Evacuation Instruction must be given to workers, occupants, and visitors within two
   days of commencing work, and then annually. These instructions must include the location of
   fire safety reference points (exits, fire equipment etc.) and the procedures for evacuating the
   building safely. All occupants and visitors are to participate in the annual evacuation exercise.


    4.3 Contractors & Volunteers

   All Contractors and Volunteers must complete both the RACV General Contractor Online
   Induction, prior to site arrival, and the Site-Specific Site Induction. The Site-Specific induction
   will outline the General Evacuation Instructions that must be adhered to.




Document Title:                            Issue: 5                                 Next review date:
FM – 6.3.5 Emergency Management Plan       Review date: July 2025                   June 2026
Noosa Resort
Document Owner:                            Authorised by:                           Page: 23 of 77
Health Safety & Wellbeing                  Manager HSW

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Emergency Management Plan Noosa - To be amended.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.