Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment 6 - Emergency Management Plan Noosa - To be amended · OPW25/0206

of 78

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
   FM – 6.3.5 Emergency Management Plan template

   CYCLONE CHECKLIST

   The following Cyclone Checklist can be utilised to assist with ensuring and managing all steps
   within the emergency response plan have been addressed and or completed.

   Stage 1 – 36 Hours from possible cyclone
        All Key Emergency Personnel have been briefed on the potential for a cyclone condition.
        The Emergency Incident Log has been established.
        Regular Cyclone Warning updates are received and Cyclone Tracking Map updated.
        All equipment is prepared – First Aid Kits, Cyclone Stores etc.
        A survey of any existing building damage is conducted and actioned.
         Guest call list is established and tracking sheet to ensure all guests are notified advising
    
         of weather conditions and noting any guest requests (ie. Assistance requirements)
        Utilities are prepared for ‘Crash Shut Down’ if required.
        Clean out building gutters and ensure drains around the property are clear
        All outdoor furniture is brought inside or secured
        Testing of emergency backup equipment (torches, generators and pumps)
        Ensure/source additional food and linen supplies


   Stage 2 – 24 Hours from probably cyclone
         All Key Emergency Personnel have commenced their tasks under the emergency
    
         response plan
        The Emergency Incident Log is updated.
        The Disaster Command Centre is established and operational.
        Regular Cyclone Warning updates are received and Cyclone Tracking Map updated.
         Sandbags and pumps have been deployed and taping / boarding of windows
    
         commenced.
        The Noosa Sound Room is set up as the Designated Safe Area.
        All outdoor furniture and restaurants are secured.
        A First Aid room and supplies have been set up.
        Critical information and IT systems have been backed up.
        Further staff and resources are available as required.
        All guests have been notified of the impending weather conditions.
        A full guest listing is obtained and distributed.
        The CEO, Executive GM and RACV Public Affairs have been notified.
        The backup generator has been tested.



Document Title:                             Issue: 5                                Next review date:
FM – 6.3.5 Emergency Management Plan        Review date: July 2025                  June 2026
Noosa Resort
Document Owner:                             Authorised by:                          Page: 49 of 77
Health Safety & Wellbeing                   Manager HSW

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Emergency Management Plan Noosa - To be amended.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.