FM – 6.3.5 Emergency Management Plan template
CYCLONE CHECKLIST
The following Cyclone Checklist can be utilised to assist with ensuring and managing all steps
within the emergency response plan have been addressed and or completed.
Stage 1 – 36 Hours from possible cyclone
All Key Emergency Personnel have been briefed on the potential for a cyclone condition.
The Emergency Incident Log has been established.
Regular Cyclone Warning updates are received and Cyclone Tracking Map updated.
All equipment is prepared – First Aid Kits, Cyclone Stores etc.
A survey of any existing building damage is conducted and actioned.
Guest call list is established and tracking sheet to ensure all guests are notified advising
of weather conditions and noting any guest requests (ie. Assistance requirements)
Utilities are prepared for ‘Crash Shut Down’ if required.
Clean out building gutters and ensure drains around the property are clear
All outdoor furniture is brought inside or secured
Testing of emergency backup equipment (torches, generators and pumps)
Ensure/source additional food and linen supplies
Stage 2 – 24 Hours from probably cyclone
All Key Emergency Personnel have commenced their tasks under the emergency
response plan
The Emergency Incident Log is updated.
The Disaster Command Centre is established and operational.
Regular Cyclone Warning updates are received and Cyclone Tracking Map updated.
Sandbags and pumps have been deployed and taping / boarding of windows
commenced.
The Noosa Sound Room is set up as the Designated Safe Area.
All outdoor furniture and restaurants are secured.
A First Aid room and supplies have been set up.
Critical information and IT systems have been backed up.
Further staff and resources are available as required.
All guests have been notified of the impending weather conditions.
A full guest listing is obtained and distributed.
The CEO, Executive GM and RACV Public Affairs have been notified.
The backup generator has been tested.
Document Title: Issue: 5 Next review date:
FM – 6.3.5 Emergency Management Plan Review date: July 2025 June 2026
Noosa Resort
Document Owner: Authorised by: Page: 49 of 77
Health Safety & Wellbeing Manager HSW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Emergency Management Plan Noosa - To be amended.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.