FM – 6.3.5 Emergency Management Plan template
FLOOR/AREA WARDEN
• Assess affected areas to determine any damage or danger
• Ensure Chief Warden is notified
• Do not enter affected area
• Evacuate any persons in the affected area, if appropriate and safe
Flood
Should severe flooding be likely to affect the resort, preparations precautions are to be put in
place to minimise the potential damage to the ground floor structures and utilities. Should the
emergency get to the point where evacuation of the ground floor areas is required, personnel
and resources are to be moved to first floor units wherever possible to protect against rising
water levels.
Where the use of reliable flood forecasting models is possible, the Bureau issues Quantitative
Flood predictions at the location of official gauges within the body of the flood warnings. The
State / Territory emergency services will be able to relate this to possible extent of flooding
around the official river height gauge using flood intelligence, gathered either through past
history or through flood mapping studies carried out by the local council (see map on next page)
Wherever possible they will issue local flood advices, informing of the likely effects of the flood
and what to do.
The Bureau of Meteorology uses the following terms. It is important to know what they mean.
MINOR FLOODING: Causes inconvenience. Low-lying areas next to watercourses are
inundated which may require the removal of stock and equipment. Minor roads may be closed
and low – level bridges submerged.
MODERATE FLOODING: In addition to the above, the evacuation of some houses may be
required. Main traffic routes may be covered. The area of inundation is substantial in rural areas
requiring the removal of stock.
MAJOR FLOODING: In addition to the above, extensive rural areas and/or urban areas are
inundated. Properties and towns are likely to be isolated and major traffic routes likely to be
closed. Evacuation of people from flood affected areas may be required.
LOCAL FLOODING: Used where intense rainfall could be expected to cause high runoff in
limited areas local to the rainfall, but not necessarily leading to significant rises in main streams.
FLASH FLOODING: Flooding occurring in less than 6 hours of rain, usually the result of intense
local rain and characterized by rapid rises in water levels. They are difficult to predict accurately
and give little time for effective preventive action.
For significant flooding to greatly affect the resort, there are two possible scenarios that would
cause this to occur –firstly the most probable being after prolonged rainfall and a subsequent
systems failure (e.g. Mechanical / electrical failure of our storm water pumping system). The
second scenario would be a massive flood of the Noosa River system.
Document Title: Issue: 5 Next review date:
FM – 6.3.5 Emergency Management Plan Review date: July 2025 June 2026
Noosa Resort
Document Owner: Authorised by: Page: 52 of 77
Health Safety & Wellbeing Manager HSW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Emergency Management Plan Noosa - To be amended.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.