Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 6 - Emergency Management Plan Noosa - To be amended · OPW25/0206

of 78

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
   FM – 6.3.5 Emergency Management Plan template

           Earthquake
   Generally, earthquakes in Australia are rare and minor. Buildings in Australia, including the
   RACV Noosa Resort, are designed to withstand a certain amount of damage without placing
   their occupants at risk. However, although rare, there is a remote possibility of building failure
   due to unexpected forces such as earthquake. Other possible causes of failure may be
   explosion, internal failure and collision.

   When Damage Occurs
   • Take immediate refuge under desk or benches, door frames, archways etc.
   • Do not use lifts
   • Stay clear of filing cabinets, shelves and bookcases etc.
   • Maintain refuge until structural safety checks are completed

   Chief Warden Duties:
   • Notify Emergency Services
   • Contact and organise Wardens and staff to carry out an injury/building safety checks and to
      report
   •   Organise for any main gas supply to be isolated
   •   When safe to do so, commence evacuation ensuring that:
          o Evacuation routes are safe
          o First aid personnel are available to assist the injured
          o All personnel are accounted for

   Floor/Area Warden Duties:
   • When safe to do so, make contact with Chief Warden
   • Organise assessment of injury and damage on your floor
   • Report to Chief Warden and be prepared to commence evacuation
   • Commence evacuation if/when directed

   Warden Duties:
   • When safe to do so, make contact with Floor Warden
   • Assist with injury and damage assessment
   • When safe to do so, organise people to allocated exit route and assist with evacuation
     if/when ordered to
   • Assist people to Assembly Area/s located at K Block.




Document Title:                           Issue: 5                                  Next review date:
FM – 6.3.5 Emergency Management Plan      Review date: July 2025                    June 2026
Noosa Resort
Document Owner:                           Authorised by:                            Page: 59 of 77
Health Safety & Wellbeing                 Manager HSW

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Emergency Management Plan Noosa - To be amended.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.