2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance Outcomes Acceptable Outcomes
(c) the likely effectiveness of erosion and sediment control
and stormwater drainage measures during rainfall
events during and post construction; and
(d) the need to protect environmental values and water
quality of receiving waters both during and post
construction.
PO2 AO2.1
Stormwater drainage infrastructure is planned, designed and Stormwater drainage planning, design and construction is in
constructed to: accordance with PSP6 Engineering Design Standards
(a) incorporate allowance for increased flood risk and tidal Roads, drainage and earthworks and the latest version of the
inundation through pipework as a result of cilmate Queensland Urban Drainage Design Manual.
change and sea level rise;
(b) ensure the development is adequately drained; and AO2.2
The stormwater drainage system connects to a lawful point of
(c) ensure stormwater is managed and lawfully discharged discharge in accordance with PSP6 Engineering Design
without altering stormwater drainage characteristics
external to the site. Standards Roads, drainage and earthworks.
AO2.3
Stormwater flows discharging from the development are
demonstrated to be consistent with predevelopment
characteristics.
AO2.4
Development provides for the management of stormwater to
incorporate appropriate allowance for climate change impacts
(including rainfall intensity and sea level rise), in accordance
with PSP6 Engineering Design Standards – Roads, Drainage
and Earthworks.
PO3 AO3.1
Stormwater drainage infrastructure conveys runoff in a manner Stormwater drainage infrastructure meets the desired
that allows roads to deliver desired standards of service standards of service for roads functionality set out in PSP6
appropriate to the local conditions and local stormwater Engineering Design Standards Roads, Drainage and
drainage characteristics. Earthworks.
PO4 AO4.1
Stormwater infrastructure is compatible with existing The location, design and construction of stormwater drainage
infrastructure, allows for easy access for the ongoing structures is in accordance with PSP6 Engineering Design
maintenance by Council, is cost effective across its design life. Standards Roads, drainage and earthworks.
AO4.2
Where infrastructure is located on private land an easement is
dedicated over the infrastructure in accordance with PSP6
Engineering Design Standards Roads, drainage and
earthworks.
AO4.3
Any alterations or repairs to infrastructure as a result of the
development are made at no cost to Council.
AO4.4
Development avoids stormwater inflow and infiltration to the
sewer infrastructure network.
AO4.5
Stormwater infrastructure is designed to minimise
**FINAL DRAFT Post Consultation 2019** Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.