Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Use                                      Additional examples include
                                               (14)    Anodising or electroplating workshop where tank area is 400 square metres or
                                                       greater.
                                               (15)    Powder coating workshop using 500 tonnes or greater of coating per annum.
                                               (16)    Spray painting workshop (including spray painting vehicles, plant, equipment or
                                                       boats) using 20,000 litres or greater of paint per annum.
                                               (17)    Concrete batching and producing concrete products.
                                               (18)    Treating timber for preservation using chemicals including copper, chromium,
                                                       arsenic, borax and creosote.
                                               (19)    Manufacturing soil conditioners by receiving, blending, storing, processing, drying
                                                       or composting organic material or organic waste, including animal manures,
                                                       sewage, septic sludges and domestic waste.
                                               (20)    Manufacturing fibreglass pools, tanks and boats.
                                               (21)    Manufacturing, fibreglass, foam plastic, composite plastic or rigid fibrereinforced
                                                       plastic or plastic products, 5 tonnes or greater per annum (except fibreglass boats,
                                                       tanks and swimming pools).
                                               (22)    Manufacturing PET, PETE, polypropylene and polystyrene plastic or plastic
                                                       products, 10,000 tonnes or greater per annum.
                                               (23)    Manufacturing tyres, asbestos products, asphalt, cement, glass or glass fibre,
                                                       mineral wool or ceramic fibre.
                                               (24)    Abattoir.
                                               (25)    Recycling chemicals, oils or solvents.
                                               (26)    Waste disposal facility (other than waste incinerator).
                                               (27)    Recycling, storing or reprocessing regulated waste.
                                               (28)    Manufacturing batteries.
                                               (29)    Manufacturing wooden products including cabinet making, joinery, wood working,
                                                       producing greater than 500 tonnes per annum.
                                               (30)    Abrasive blasting facility using 10 tonnes or greater of abrasive material per
                                                       annum.
                                               (31)    Crematoria.
                                               (32)    Glass fibre manufacture producing 200 tonnes or greater per annum.
                                               (33)    Manufacturing glass or glass products, where not glass fibre, less than 250 tonnes
                                                       per annum.



 SC1.2 Administrative terms
     (1)    Administrative terms and definitions assist with the interpretation of the planning scheme but do not have a specific land-use
            meaning.
     (2)    A term listed in column 1 of Table1.2.2 (Administrative terms and definitions) has the meaning set out beside that term in
            column 2.
     (3)    The administrative definitions listed here are the definitions for the purpose of the planning scheme.

 Table SC1.2.1 - Index of administrative definitions
      Index of Administrative definitions

      Accepted development                            Electricity transmission line easement       Rear lot
      Access                                          Environmentally relevant activity (ERA)      Reasonably necessary
      Access strip                                    ERA                                          Reconfiguring of a lot
      Accommodation unit                              Environmentally sensitive areas              Recruitment habitat tree
      Acid sulfate soils                              Essential community infrastructure           Regrowth
      ASS                                             Exempt clearing                              Removable building or removal home
      Active recreation areas                         Extractive resources                         Resource processing area
      Adjoining premises                              Extractive resources separation area         Riparian buffer area


**FINAL DRAFT - Post Consultation 2019**                                                                                                Page 18 of 38
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.