Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
     ancillary means associated with, but incidental and subordinate to.

     Approved route for electricity transmission operating works
     approved route for electricity transmission operating works includes land affected by –
     (a)   existing transmission lines and operating works;
     (b)   proposed operating works the subject of a notice under the Electricity Act 1994, section 111 B;
     (c)   community infrastructure – operating works under the Electricity Act 1994, designated by the planning minister; and
     (d)   a future corridor study and determined by Powerlink as appropriate for proposed operating works and may be designated for
           community infrastructure in the future.

     Assessable development
     assessable development is development for which a development approval is required.

     Average recurrence interval (ARI)
     average recurrence interval or ARI means the average or expected value of the period between exceedances of a given rainfall
     intensity or discharge.

     ARI
     ARI (average recurrence interval) means the average or expected value of the period between exceedances of a given rainfall
     intensity or discharge.

     Average width
     average width, of a lot, means the distance, measured in metres, between the midpoint on each side boundary of the lot.

     Balcony
     balcony means any external platform, attached to and accessed from a building and 1 metre or more above adjacent
     finished ground level. A balcony is part of a building.

     Base date
     base date means the date from which the local government has estimated future infrastructure demand and costs for the
     local government area.

     Basement
     basement means a space—
     (a)   between a floor level in a building and the floor level that is immediately below it; and
     (b)   no part of which is more than 1m above ground level.

     Bedroom
     bedroom means an area of a building or structure which:
     (a)   is used, designed or intended for use for sleeping (but excludes a lounge room, dining room, living room, kitchen, water
           closet, bathroom, laundry, garage or plant room); or
     (b)   other habitable rooms that council considers to be able to be used for sleeping such as a library, study, loft, sewing room,
           media or home entertainment room, library, family or rumpus room or other similar space

     Building
     building means a fixed structure that is wholly or partly enclosed by walls and is roofed, and includes any part of a building.

     Building envelope
     building envelope is an area on a lot designated for the siting of a building and works. It is used to demonstrate there is sufficient
     area to accommodate the intended purpose of the lot.

     Building height
     building height of a building, means—
     (a)   the vertical distance, measured in metres, between the ground level of the building and the highest point on the roof of the
           building, other than a point that is part of an aerial,chimney, flagpole or load-bearing antenna; or


**FINAL DRAFT - Post Consultation 2019**                                                                                               Page 21 of 38
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.