2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
     DFE/DSTE
     defined flood event means the event, measured in terms of the likelihood of occurrence, adopted by the Council to manage
     development as identified in Table 8.2.6.5 Flood Levels and Flood Immunity Requirements of the Flood hazard overlay code. The
     DFE incorporates an allowance for future climate change over the design life of the development, through increased rainfall
     intensities and mean sea level rise.

     defined storm tide event means the event, measured in terms of the likelihood of occurrence, adopted by the Council to manage
     development as identified in Table 8.2.6.5 Flood Levels and Flood Immunity Requirements of the Flood hazard overlay code. The
     DSTE incorporates an allowance for future climate change over the design life of the development, through increased rainfall
     intensities and mean sea level rise.

     Demand unit
     demand unit means a unit of measurement for measuring the level of demand for infrastructure.

     Development footprint
     development footprint for development, means a part of the premises that the development relates to, including, for example, any
     part of the premises that, after the development is carried out, will be covered by—
     (a)   buildings or structures, measured to their outermost projection; or
     (b)   landscaping or open space; or
     (c)   facilities relating to the development; or
     (d)   on­site stormwater drainage or wastewater treatment; or
     (e)   a car park, road, access track or area used for vehicle movement; or
     (f)   another area of disturbance.

     Domestic outbuilding
     domestic outbuilding means a non-habitable class 10a building that is—
     (a)   a shed, garage or carport; and
     (b)   ancillary to a residential use carried out on the premises where the building is.

     Drainage line
     drainage line means any channel, not being a watercourse that carries a flow either permanently or intermittently and includes
     drainage lines shown on the Biodiversity, Waterways and Wetlands Overlay Maps.

     Dwelling
     dwelling means all or part of a building that—
     (a)   is used, or capable of being used, as a self­contained residence; and
     (b)   contains—
           (i)     food preparation facilities; and
           (ii)    a bath or shower; and
           (iii)   a toilet; and
           (iv)    a wash basin; and
           (v)     facilities for washing clothes.

     Ecological linkages
     ecological linkages means existing and potential habitat connections within and between ecologically important areas that promote
     movement of fauna and gene flow between populations and include patches of remnant and regrowth vegetation that provide
     ‘stepping stones’ to other habitat.
     Some of the major ecological linkages across the Noosa Shire landscape are shown on Strategic Framework Map SFM4
     Biodiversity and Environment.

     Ecologically important areas
     ecologically important areas means—




**FINAL DRAFT - Post Consultation 2019**                                                                                          Page 24 of 38
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.