Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                            Acceptable outcomes

      (b)   is managed to avoid or minimise the release of acid and         according to the National Acid Sulfate Soils Guidance;
            metal contaminants, where disturbance of ASS is           (b)   not excavating or otherwise removing soil or sediment
            unavoidable.                                                    containing ASS;
                                                                      (c)   not permanently or temporarily extracting groundwater
                                                                            that results in the aeration of previously saturated ASS;
                                                                            and
                                                                      (d)   not undertaking filling on land at or below 5 metres AHD
                                                                            that results in:­
                                                                            (i)    actual ASS being moved below the water table; or
                                                                            (ii)   previously saturated ASS being aerated.


                                                                      Editor's note—National Sampling and Identification Methods
                                                                      Guidelines is a reference to:
                                                                      (a) National Acid Sulfate Soils Guidance: National acid
                                                                      sulfate soils sampling and identification methods manual,
                                                                      Department of Agriculture and Water Resources, Canberra
                                                                      (Sullivan et al, 2018); and
                                                                      (b) National Acid Sulfate Soils Guidance: National Acid
                                                                      Sulfate Soils Identification and Laboratory Methods Manual,
                                                                      Department of Agriculture and Water Resources, Canberra;
                                                                      and
                                                                      (c) the Australian Standard 4969.

                                                                      OR

                                                                      AO1.2
                                                                      The disturbance of ASS avoids the release of acid and metal
                                                                      contaminants by:­
                                                                      (a)   undertaking an ASS investigation conforming to
                                                                            the National Acid Sulfate Soils Guidance;
                                                                      (b)   neutralising existing acidity and preventing the
                                                                            generation of acid and metal contaminants using
                                                                            strategies documented in the Soil Management
                                                                            Guidelines; and
                                                                      (c)   preventing the release of surface or groundwater flows
                                                                            containing acid and metal contaminants into the
                                                                            environment.

                                                                      AND

                                                                      Editor's note—Soil Management Guidelines is a reference to
                                                                      the 'Soil Management Guidelines. Queensland Acid Sulfate
                                                                      Soils Technical Manual'. Dear SE, Moore NG, Dobos SK,
                                                                      Watling KM and Ahern CR. Department of Natural Resources
                                                                      and Mines (2002).

                                                                      AO1.3
                                                                      Where potential or actual ASS is identified, they are managed in
                                                                      accordance with an ASS management plan.




**FINAL DRAFT ­ Post Consultation 2019**                                                                                           Page 2 of 2
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.