Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
(c) temporary or nonintensive uses that are compatible with
future extractive industry operations.
Development within Extractive Resource Processing / Separation Areas
PO2 AO2.1
Development within the resource processing/separation area: Development does not result in the creation of additional lots
(a) does not materially increase the number of people living used or capable of being used for residential purposes.
in the separation area;
AO2.2
(b) incorporates measures to avoid or mitigate adverse
Where realigning boundaries, the development does not
impacts from the extracting and transporting of the
worsen the situation with respect to the distance between
extractive resource; and
available house sites and the resource processing area.
(c) does not compromise the function of the separation area
in providing a buffer between the extractive industry and AO2.3
other incompatible uses beyond the separation area. Development does not result in an increase in the scale or
density of residential uses within a resource/processing
separation area;
OR
AO2.4
Development within the extractive resource separation area
incorporates design, orientation and construction materials that
mitigate potential adverse effects from an existing or future
extractive industry;
OR
AO2.5
Development within the extractive resource separation area
operates outside the normal hours of operation for existing or
future extractive industry activities.
AO2.6
Extractive industry development does not occur within the
extractive resource separation area.
OR
AO2.7
Where extractive industry development occurs within the
extractive resource separation area, the extractive industry does
not impact on sensitive land uses located within or outside of
the extractive resource separation area.
Editor’s Note—Where lots have land both within and outside
the separation area, a residential use of the lot may be
approved provide dwellings are located outside the separation
areas. Plans lodged with Council shall include building
envelopes that identify the location of the dwelling.
Development within Transport Route Separation Areas
PO3 AO3.1
Development does not materially increase the number of Development does not result in an increase in the scale or
people living in a transport route separation area. density of residential uses within a transport route separation
area.
AO3.2
Reconfiguring a lot within a transport route separation area:
**FINAL DRAFT Post Consultation 2019** Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.