Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Noosa Shire Planning Scheme
 Part 8 Overlays
 8.2 Overlay codes
     The overlay codes for the planning scheme are:
     (a)    Acid Sulfate Soils Overlay Code
     (b)    Biodiversity, Waterways and Wetlands Overlay Code
     (c)    Bushfire Hazard Overlay Code
     (d)    Coastal Protection and Scenic Amenity Overlay Code
     (e)    Extractive Resources Overlay Code
     (f)    Flood Hazard Overlay Code
     (g)    Heritage Overlay Code
     (h)    Landslide Hazard Overlay Code
     (i)    Regional Infrastructure Overlay Code

 8.2.6 Flood Hazard Overlay Code

     Application
     (1)    This code applies to assessable development:
            (a)    in the Flood Hazard Overlay shown on the overlay maps contained within Schedule 2 Mapping; and
            (b)    identified as requiring assessment against the Flood Hazard overlay code by the tables of assessment in Part 5
                   (Tables of Assessment).

     (2)    All provisions of the code are assessment benchmarks for applicable assessable development.



     Editor's Note—The Flood Hazard Overlay Maps in Schedule 2 (Mapping) identify flooding and inundation areas where flooding and storm tide
     modelling has been undertaken by Council. Other areas not identified by the Flood Hazard Overlay may also be subject to flooding or storm tide
     inundation. Maximum flow velocity mapping is also available from Council.

     Editor’s Note—Planning scheme policy 9 for Assessment of Natural Hazards provides guidance for achieving certain outcomes of this code,
     including for the preparation of a flood hazard assessment and mitigation report.

     Purpose and overall outcomes
     (1)    The purpose of the Flood Hazard overlay code is to:
            (a)    provide for the assessment of the compatibility of development in the flood hazard overlay to flood and storm tide
                   inundation risk, taking into account the predicted effects of climate change;
            (b)    ensure that risk to life, property, community, economic activity and the environment during flood and storm tide
                   inundation events is avoided or mitigated; and
            (c)    ensure that development does not increase potential for flood damage on­site or to other property.

     (2)    The overall outcomes sought for the Flood Hazard overlay code are:
            (a)    Development in areas at risk from flood and storm tide inundation is compatible with the nature of the defined flood
                   event or defined storm tide event.
            (b)    Development protects floodplains and the flood conveyance capacity of waterways.
            (c)    Development is resilient to flood and storm tide events by ensuring siting and design responds to and minimises
                   potential risks of flood and storm tide inundation to people and property.
            (d)    Development directly, indirectly and cumulatively avoids an unacceptable increase in the extent or severity of flood or
                   storm tide inundation and does not significantly increase the potential for damage on the site or to other properties.
            (e)    Development supports and does not unduly burden disaster management response or recovery capacity and
                   capabilities.


**FINAL DRAFT ­ Post Consultation 2019**                                                                                                     Page 1 of 7
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.