Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                            Acceptable outcomes
      Essential community infrastructure is is able to function       Development involving essential community infrastructure is
      effectively during and immediately after landslide events.      not located within a landslide hazard area as identified on
                                                                      a Landslide Hazard Overlay Map;

                                                                      OR

                                                                      AO2.2
                                                                      Development involving essential community infrastructure is
                                                                      located in a low or very low landslide hazard area and on
                                                                      land less than 15% slope, as determined by a site­specific
                                                                      slope­analysis;

                                                                      Editor's Note—A site­specific geotechnical assessment
                                                                      may be used to demonstrate that although the proposed
                                                                      development is shown on the Landslide Hazard Overlay as
                                                                      being in the moderate, high or very high landslide hazard
                                                                      area, the landslide risk is low or very low.

                                                                      AO2.3
                                                                      A site­specific geotechnical assessment is prepared by a
                                                                      registered professional engineer to certify that:
                                                                      ﴾a﴿   the long term stability of the site, including
                                                                            associated buildings and infrastructure, will be
                                                                            maintained and operational for the life of the
                                                                            development;
                                                                      ﴾b﴿   access to the site will not be impeded by a landslide
                                                                            event;
                                                                      ﴾c﴿   the community infrastructure will not be adversely
                                                                            affected by landslide activity originating from other
                                                                            land, including land above the site; and
                                                                      ﴾d﴿   development of the site will not increase the risk of
                                                                            landslide activity on other land.

     Table 8.2.8.3 ­ Criteria for assessable development (part)
      Performance outcomes                                            Acceptable outcomes

      SteepSloping landsites, landscape character and scenic amenity
      PO3                                                       AO3.1
      Development, including associated access, is designed and Buildings present no more than two storeys at any one
      constructed to:                                           point when viewed from the road or other public space.
      ﴾a﴿   be responsive to the natural topography and
            constraints imposed by the slope;                         AO3.2
                                                                      Buildings and associated accesses are not constructed on
      ﴾b﴿   retain the natural landforms, landscape character,
                                                                      land with a slope greater than 25% (1 in 4).
            vegetation, including the visual amenity of hill slopes
            and ridgelines;
                                                                      AO3.3
      ﴾c﴿   visually integrate into the streetscape and the natural   No additional lots intended to provide house sites are
            surrounds; and                                            created on land with a slope of 25% or greater.
      ﴾d﴿   ensure buildings and structures are not visually
            obtrusive, particularly from ridgelines, public open      AO3.4
            spaces, scenic routes and other critical vantage          Buildings are designed to follow the natural landform rather


**FINAL DRAFT ­ Post Consultation 2019**                                                                                            Page 3 of 4
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗