Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
Essential community infrastructure is is able to function Development involving essential community infrastructure is
effectively during and immediately after landslide events. not located within a landslide hazard area as identified on
a Landslide Hazard Overlay Map;
OR
AO2.2
Development involving essential community infrastructure is
located in a low or very low landslide hazard area and on
land less than 15% slope, as determined by a sitespecific
slopeanalysis;
Editor's Note—A sitespecific geotechnical assessment
may be used to demonstrate that although the proposed
development is shown on the Landslide Hazard Overlay as
being in the moderate, high or very high landslide hazard
area, the landslide risk is low or very low.
AO2.3
A sitespecific geotechnical assessment is prepared by a
registered professional engineer to certify that:
﴾a﴿ the long term stability of the site, including
associated buildings and infrastructure, will be
maintained and operational for the life of the
development;
﴾b﴿ access to the site will not be impeded by a landslide
event;
﴾c﴿ the community infrastructure will not be adversely
affected by landslide activity originating from other
land, including land above the site; and
﴾d﴿ development of the site will not increase the risk of
landslide activity on other land.
Table 8.2.8.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
SteepSloping landsites, landscape character and scenic amenity
PO3 AO3.1
Development, including associated access, is designed and Buildings present no more than two storeys at any one
constructed to: point when viewed from the road or other public space.
﴾a﴿ be responsive to the natural topography and
constraints imposed by the slope; AO3.2
Buildings and associated accesses are not constructed on
﴾b﴿ retain the natural landforms, landscape character,
land with a slope greater than 25% (1 in 4).
vegetation, including the visual amenity of hill slopes
and ridgelines;
AO3.3
﴾c﴿ visually integrate into the streetscape and the natural No additional lots intended to provide house sites are
surrounds; and created on land with a slope of 25% or greater.
﴾d﴿ ensure buildings and structures are not visually
obtrusive, particularly from ridgelines, public open AO3.4
spaces, scenic routes and other critical vantage Buildings are designed to follow the natural landform rather
**FINAL DRAFT Post Consultation 2019** Page 3 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.