Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                              Acceptable Outcomes
      service area, an adequate, reliable, safely located and freely    (a)   an accessible dam, swimming pool or water tank
      accessible water supply is provided for fire fighting purposes,         available for firefighting purposes with an onsite water
      which is in addition to day to day water supply.                        volume of not less than 5,000 litres; and
                                                                        (b)   a water supply outlet pipe 50 millimetres in diameter and
                                                                              fitted with a standard fire brigade fitting connected to the
                                                                              water supply (other than where the water supply is in a
                                                                              swimming pool or dam).

                                                                        Editor’s Note — Water supply capacity for firefighting purposes
                                                                        is in addition to water supply capacity for household use.
      Flood Hazard Area
      PO16                                                              AO16.1
      Where located in the Flood Hazard Area as shown on Flood          TheWhere the development is located in the Flood Hazard Area
      Hazard Overlay Map in Schedule the developmentDevelopment         as shown on Flood Hazard Overlay Map in Schedule 2,
      is designed and sited to ensure risk to people and property       the finished floor level of habitable rooms is at least 300
      from flooding is avoided or minimised.                            millimetres above the Defined flood event (DFE);

                                                                        OR

                                                                        AO16.2
                                                                        Where the DFE has not been modelled for the area, the
                                                                        finished floor level of habitable rooms is at least
                                                                        500 millimetres above the highest recorded flood.

                                                                        Editor's noteNote—The QDC mandatory provisions MP3.5 also
                                                                        apply to the construction of buildings in flood hazard areas.
      PO17
      Underground car parking areas are designed to drain and           No acceptable outcome provided
      function safely during a flood event and power failure.
                                                                        Editor's note—Basements should have flood immunity above
                                                                        the 1%AEP defined flood event with alternative means to
                                                                        mechanical pumping used to achieve such immunity.


      Major Electricity Infrastructure & Substations
      PO18                                                              AO18.1
      Development is sufficiently separated from major electricity      Development including any sensitive land uses is at least:
      infrastructure and substations to minimise the likelihood of            50 metres from a transmission substation;
                                                                        (a)
      nuisance or complaint.
                                                                        (b)   10 metres from any other substation; and
                                                                        (c)   30 metres from a transmission line easement.

                                                                        AO18.2
                                                                        Habitable buildings are not located within an easement for a
                                                                        distribution line.
      PO19                                                              AO19
      Development is located and designed to avoid or minimise          Noise emissions do not exceed 5db(A) above background
      noise nuisance from the use of infrastructure.                    noise level internal to a habitable building measured in
                                                                        accordance with AS1055.
      PO20                                                             AO20
      Wherever practicable habitable buildings are orientated to avoid Where adjoining substations or major electricity infrastructure,
      direct overlooking of major electricity infrastructure or        habitable buildings are orientated so that the majority of
      substations.                                                     outdoor living areas and windows of habitable rooms face away
                                                                       from the infrastructure.
      Earthworks and Drainage
      PO21                                                              No acceptable outcome provided


**FINAL DRAFT ­ Post Consultation 2019**                                                                                             Page 6 of 7
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.