2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                              Acceptable Outcomes
                                                                              a swimming pool or dam).

                                                                        Editor’s Note — Water supply capacity for firefighting purposes
                                                                        is in addition to water supply capacity for household use.
      Flood Hazard Area
      PO15                                                             AO15.1
      Where located in the Flood Hazard Area as shown on Flood         The finished floor level of habitable rooms is at least 300
      Hazard Overlay Map in Schedule 2 the development is designed millimetres above the Defined flood event (DFE); or
      and sited to ensure risk to people and property from flooding is
      avoided or minimised.                                            AO15.2
                                                                       Where the DFE has not been modelled for the area, the
                                                                       finished floor level of habitable rooms is at least 500
                                                                       millimetres above the highest recorded flood.

                                                                        Editor's note—The QDC mandatory provisions MP3.5 also
                                                                        apply to the construction of buildings in flood hazard areas.
      Landslide Hazard Area
      PO16                                                              AO16.1
      Development maintains the safety of people, property and          Development, including associated access, is not located on
      hazardous materials stored in bulk from the risk of landslide.    land identified as a landslide hazard area on a Landslide
                                                                        Hazard Overlay Map;

                                                                        AO16.2
                                                                        Development, including associated access, is located outside
                                                                        moderate, high and very high landslide hazard areas and areas
                                                                        with 15% slope or greater, as determined by a site­specific
                                                                        slope­analysis;

                                                                        Editor's Note—A site­ specific geotechnical assessment may
                                                                        be used to demonstrate that although the proposed
                                                                        development is shown on the Landslide Hazard Overlay as
                                                                        being in the moderate, high or very high landslide hazard area,
                                                                        the landslide risk is low or very low

                                                                        AO16.3
                                                                        A site­specific geotechnical assessment is prepared by a
                                                                        registered professional engineer to certify that:
                                                                        (a)   the stability of the site, including associated buildings
                                                                              and infrastructure, will be maintained and operational for
                                                                              the life of the development;
                                                                        (b)   the site is not subject to the risk of landslide activity
                                                                              originating from other land, including land above the site;
                                                                              and
                                                                        (c)   development of the site will not increase the risk of
                                                                              landslide activity on other land.

                                                                        Editor's Note— PSP8 Natural Hazards provides further
                                                                        guidance on assessing landslide hazard.

                                                                        AO16.4
                                                                        Any specific measures identified in a site specific geotechnical
                                                                        assessment for stabilising the site or development are to be
                                                                        fully implemented.




**FINAL DRAFT ­ Post Consultation 2019**                                                                                                Page 6 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.