Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn are setback a minimum of 10 metres from the top of the bank of
a waterway.
Editor’s Note—Setbacks to waterways for certain uses and
works are also specified in the relevant codes.
Editor's Note—Wetland areas are identified on the Queensland
Wetland Program mapping
Editor's Note—Any clearing of vegetation also needs meet the
outcomes of the Earthworks Code and Water Quality and
Drainage Code.
PO7
Vegetation within 400 metres of the full ponded water within No acceptable outcome provided.
Lake Macdonald is retained.
PO8 AO8.1
Development on land adjacent to a waterway or wetland Development adjacent to a waterway or wetland provides that:
maintains appropriate extent of public access to waterways and (a) no new lots directly back onto a riparian buffer area; and
wetlands and minimises edge effects.
(b) new public roads are located between a riparian buffer
area or riparian zone and the proposed development
area.
Table 8.2.2.3. Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Surface and ground water hydrology
PO9 AO9.1
Development ensures that the natural surface water and Development does not impact on the natural surface water or
ground water hydrologic regimes of waterways, wetlands and groundwater hydrologic regimes and this is facilitated by:
hydrologicallysensitive plant communities are not adversely (a) avoiding or minimising channelization, redirection or
impacted. interruption of flow;
(b) avoiding groundwater extraction;
Editor's Note—Groundwater dependent ecosystems are
identified on Queensland Government Wetland Info mapping. (c) maintaining groundwater recharge and discharge
processes;
(d) maintaining natural groundwater fluctuations;
(e) avoiding causing ingress of saline water into freshwater
aquifers of wetlands; and
(f) avoiding contaminants entering groundwater (e.g. from
runoff, effluent disposal).
Table 8.2.2.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Rehabilitation of ecologically important areas
PO10 AO10.1
Development provides for ecologically important areas to be Landscaping and rehabilitation complements and supports
restored and enhanced through: ecologically important areas by:
(a) designing landscaped areas to complement and (a) utilising local native species;
enhance existing vegetation and ecological linkages; (b) utilising suitable plant species identified in PSP2
(b) removing species likely to displace native flora species Landscaping;
or degrade fauna habitat; (c) restoring degraded ecosystems to achieve a functional
(c) replanting and rehabilitating degraded habitat; ecosystem state that requires minimal human
**FINAL DRAFT Post Consultation 2019** Page 5 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.