27.05 - UPDATE - Relodgement - Madill

Attached to the e-mail Change to Application Notice – MCU118/0157 – 130 Eumundi Noosa Rd Noosaville.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

          Development Application
              Planning Report


         Change to Application
      Responding to Further Advice


  Material Change of Use for Industrial Business Type 2
(Brewery) and ancillary Entertainment & Dining Business
Type 3 (Brew Cafe) within an existing building situated at
         130 Eumundi Noosa Road, Noosaville
                   (Lot 6 RP173876)




                                                   Page 1 of 13
Log in to download the original file

27.05 - UPDATE - Relodgement - Madill.pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 12 pages

Page 2

Contents
1.0        Summary ............................................................................................................................ 3
   1.1 Change to the application (26.1c DA Rules) ....................................................................................... 3
   1.2 Development application details ...................................................................................................... 3
   1.3 Planning instrument details .............................................................................................................. 3
   1.4 Referral agencies .............................................................................................................................. 4
2.0 Site details............................................................................................................................... 4
   2.1 Site description ................................................................................................................................ 4
   2.2 Surrounding land uses ...................................................................................................................... 5
3.0 Proposed development details ................................................................................................ 7
4.0 Planning assessment ............................................................................................................... 9
   4.1         Pre‐lodgement ............................................................................................................................ 9
   4.2         Key issues ................................................................................................................................. 10
        4.2.1 Dining Use Subordinate to the Industrial Use .................................................................................. 10
        4.2.2 Parking .............................................................................................................................................. 11
        4.2.3 Landscaping ...................................................................................................................................... 12
5.0 State assessment and other matters ..................................................................................... 12
   5.1 State interests ................................................................................................................................ 12
        5.1.1 Matters established in the Planning Regulation ............................................................................ 12
        5.1.2 State Planning Policy ....................................................................................................................... 12
6.0 Conclusion ............................................................................................................................ 12




Client Name:            Boiling Pot Brewery
Prepared by:            Jack Lewis B.Sc Hons UNSW, M.Plan OTAGO
Version:                3 – This updated report is a change to the application in accordance with Section 52 (1) of the
                        Planning Act 2017 and Part 6 of the DARules
Date:                   27 May 2019




This report is based on the QLD Government’s planning report template (Department of Infrastructure, Local Government
and Planning), which adopts a ‘report-by-exception’ approach. The planning report only discusses the key issues and
matters where a proposed development does not exactly meet the requirements of, or conflicts with, a planning scheme or
other planning instrument.

Disclaimer: While every care has been taken in preparing this report, Pivotal Perspective Pty Ltd accepts no responsibility
for decisions or actions taken as a result of any data, information, statement or advice, expressed or implied, contained
within. To the best of our knowledge, the content was correct at the time of publishing.




                                                                                                                                                   Page 2 of 13

Page 3

1.0 Summary
1.1 Change to the application (26.1c DA Rules)
This updated report is in response to a further advice meeting held between Council Planning staff
and the applicant on the 27 May 2019. The meeting discussed key issues relating to carparking, use
hours and landscaping.

In accordance with Section 52(1) of the Planning Act 2016, this application is accompanied by a notice
changing a development application, before it is decided.

In accordance with section 26.1 c) of the DA Rules the assessment process does not stop - as the
change only deals with a matter raised in response to further advice provided by an assessing
authority about the application. Although Part 4 (Public Notification) was applicable and concluded –
the assessment manager has confirmed (within the meeting) that further public notification is not
required as the change would not be likely to attract any additional submissions objecting to the thing
comprising the change.

1.2 Development application details
  Proposed development:             Entertainment & Dining Business Type 3 (Brew cafe)
                                    associated with an Industrial Business Type 2 (Brewery) within
                                    an existing industrial building.
  Type of approval sought:          Development Permit for Material Change of Use
  Site address:                     130 Eumundi Noosa Rd, Noosaville
  Real property description:        6 RP173876
  Site area:                        Total lot area (lot 6) = 2,276m2
                                    Relevant lease area = 1,120m2
  Assessment manager:               Noosa Council
  Owner details:                    HarrisonHunter Pty Ltd (TTE)
  Applicant details:                Boiling Pot Brewery c/- Pivotal Perspective Pty Ltd


1.3 Planning instrument details
  State planning policy:            Nil
  Regional plan: Designation:       SEQ Regional Plan 2009–2031 (version commenced 2 May
                                    2014), urban footprint designation.
  Planning scheme:                  The Noosa Plan
  Zone:                             Industry zone
  Level of assessment:              Impact
  Applicable overlays:              Nil
  Applicable codes:                 Noosaville Locality Code
                                    Business Uses Code
                                    Landscaping Code
                                    Engineering Works Codes


                                                                                          Page 3 of 13

Page 4

1.4 Referral agencies
Nil


2.0 Site details

2.1 Site description
Table 1: Site description
 Site characteristic                                     Description


 Existing structures    Lot 6 (relevant lease area)
                        16m x 25m industrial shed (400m2 area with mezzanine storage and
                        approximately 6m high) with 8 formed carparking spaces and access from
                        Venture Drive. The eastern portion of the site includes the existing Bridgestone
                        tenancy with associated parking, loading and storage areas.
 Frontage and           Lot 6 (relevant lease area)
 access                 20m street frontage to Venture Drive.
                        35m street frontage to Project Avenue.
 Topography             Lot 6 (relevant lease area)
                        The concrete access driveway, manoeuvring area and building are all
                        constructed at FL13.5m. The site then drops down to the Project Avenue road
                        level at a rate of approximately 1 in 4.
                        Lot 6 (relevant lease area)
 Existing vegetation    There are existing established trees and shrubs surrounding the driveway and
                        manoeuvring areas.




Figure 1: Aerial view with zoning overlay
Source: Noosa Council Mapping System



                                                                                          Page 4 of 13

Page 5

Figure 2: Aerial view and site identification (relevant lease areas highlighted)
Source: Noosa Council Mapping System


2.2 Surrounding land uses
Table 2: Surrounding land uses
 Surrounding land uses

             Across Venture Drive to the north are existing industrial buildings including AutoPro
             and Venture Cycles businesses.




   North




             Adjoining the site to the south is the rear entrance to 134 Eumundi Noosa Rd, which
             includes two industrial business uses fronting Eumundi Noosa Rd (Pit Stop
             Automotive and Rug Shop). Further to the south is the existing Adventure Sports
             building.

  South




                                                                                         Page 5 of 13

Page 6

       Directly to the east of the building is the Bridgestone tyre and mechanical business
       fronting Eumundi Noosa Drive and Venture Drive roundabout.



East




       Across Project Avenue to the west is the Thomas Surfboards manufacturing business.




West




                                                                                  Page 6 of 13

Page 7

3.0 Proposed development details
The application proposes a building fitout within the existing industrial shed at 130 Eumundi Noosa
Rd, including new roller doors along the western and northern facades, as well as landscaping along
the western courtyard. The brewery will produce and package beer for sale on site ready for
distribution offsite in bulk. The application also proposes a small bar and dining area within the
western portion of the building and adjoining outdoor terrace (brew café).

The brew cafe dining area will be separated from the industrial use by the bar and kitchen to create
a more ‘intimate’ retail bar experience. The applicant proposes to use the upstairs boardroom above
the bar area for industrial tour visits (with no taps and an external stair and wall separating this area
from the rest of the brew cafe area). Light meals will also be prepared in accordance with the
Responsible Service of Alcohol requirements and Council restrictions for liquor licencing. A use area
breakup is provided below:

     Table 1. Use Areas
      Use Area                                                 505m2                     100%
      Industry                                                 320m2                     63%
      Ground Floor (185m2)
      Cold Storage 1 & 2, brewery floor and cold room          185m2                     36%
      First Floor (135m2)
      Office area                                              40m2 (boardroom) and      10%
                                                               10m2 (office)
       Loft 1 & 2, Store 4 and staff toilets                   85m2                      17%
       Entertainment & Dining                                  130m2                     26%
       Toilets                                                 15m2                      3%
       Inside dining                                           60m2                      12%
       Outside terrace dining                                  55m2                      11%
       Kitchen & Food Storage Areas                            55m2                      11%
       Kitchen and survey                                      40m2                      8%
       Bar                                                     15m2                      3%




Figure 3: Use area plans




                                                                                             Page 7 of 13

Page 8

Carparking
The carparking area is proposed to be line marked to accommodate 12 equivalent onsite carparking
spaces. The site is to be serviced by a 6.0m long Pantech vehicle, which will include manoeuvring
and loading areas within the northeastern part of the building – this area can also be used by a
courtesy bus (coaster – 12 seater bus) and/or park within carparking space no. 6. No vegetation is
required to be removed to accommodate new parking and line marking on the site, with
supplementary planting adjacent the entrance.

Staff
The following staff are required for the industrial and subordinate brew cafe:

Industrial
- Two (2) staff required for the production component (head brewer and support staff)
- Two (2) administration staff

Brew Cafe
- Two (2) bar staff during bar operating hours
- Two (2) kitchen staff during kitchen operating hours

Table 2: Summary of development aspects
Material change of use

 Building height               No Change

 Total Use Area (TUA)          Existing building includes 400m2 total use area and unapproved
                               mezzanine storage.
                               Proposed building fitout includes a total use area of 505m2 including;
                               - 320m2 of industrial (185m2 ground floor, 135m2 mezzanine) (63%);
                               - 130m2 of dining (15m2 toilets, 60m2 front of bar, 55m2 terrace) (26%)
                               - 55m2 of back of house kitchen/bar area (11%).
 Gross Floor Area (GFA)        Proposed fitout includes a total gross floor area of 452m2 including;
                               - 327m2 of industrial (185m2 ground floor, 142m2 mezzanine (stairs));
                               - 75m2 of dining area (15m2 toilets, 60m2 front of bar)
                               - 55m2 of back of house kitchen/bar area.
 Parking                       Existing Parking = 8 spaces (1 per 50m2).
                               Proposed Parking = 12 equivalent onsite spaces and a courtesy bus
                               able to seat up to 12 people.
                               The bus is proposed for loading and manoeuvring on the site and can
                               fit within the onsite loading area for the Pantech.
                               Bicycle Parking = 5 racks (to be provided adjacent to the waste
                               storage area).
 Proposed    servicing         Servicing and deliveries using a Pantech design vehicle (6m x 2.4m),
 arrangements                  which can be parked internally.
                               A waste storage and screened bunded wash down area is located
                               adjacent the loading dock entrance.
                               The site is connected to all relevant electrical, telecommunications,
                               sewerage and water services.
 Trading Hours                 Industrial Business Activities
                               7am to 4pm Monday to Friday and 7am to Midday Saturday (when
                               staff required for the brewing process).
                               Brew Café
                               5pm to midnight Monday to Friday and midday to midnight weekends.
                                                                                           Page 8 of 13

Page 9

 Landscaping                  Over 20% of the site is to be landscaped, with parking areas setback
                              (on average) more than 2m from the property boundaries.




Figure 4: Proposed Site Plan



4.0 Planning assessment

4.1     Pre-lodgement
An informal pre-design meeting was undertaken with Council’s Development Planner in June and
September to discuss planning requirements and key issues applicable to this development
application.

A further meeting was undertaken with senior officers in December (onsite) and February in response
to the Council information request.

This changed application responds to further issues pertaining to carparking, landscaping and use
areas. This revised report is in response to the Council and the applicants agreed use of the site
before and after 5pm.

Table 3: Summary of key issues
 Issue         Council response               Applicant response
 Brewery Use      The bar/restaurant must Daytime Hours
 and              remain      ancillary and   7am-5pm Mon to Friday
 Entertainment    subordinate        to  the  7am-Midday Saturday
 & Dining Use     industrial use.            - The industrial brewery use is operational in the
                                                daytime between 7am and 5pm requiring a
                                                maximum of 4 onsite staff.


                                                                                        Page 9 of 13

Page 10

                                                -   Brewery tours will be carried out in the daytime
                                                    (patrons only arriving by courtesy bus able to park
                                                    within a carspace).
                                                -   Retail sales of packaged cans may also be carried
                                                    out within the bar area.

                                              Evening Hours
                                               5pm–Midnight Mon to Friday;
                                               Midday-Midnight Saturday & Sunday
                                              - No industrial brewery staff usually required onsite.
                                              - Use of indoor and outdoor dining areas allowed.
                                              - Courtesy bus provided with parking and
                                                 manoeuvring onsite.
 Carparking       Ensure adequate parking Appropriate carparking spaces are provided on the
                  is provided for the retail site to accommodate the different times the industrial
                  tasting area at a rate of 1 and brew cafe uses are carried out.
                  per 10m2 of use area.


4.2      Key issues
4.2.1 Dining Use Subordinate to the Industrial Use

Rather than construct a new building on a green field site, this application seeks to use an existing
industrial building, which has already been fitout with industrial brewing equipment. The site is
located on a corner at the entrance to the industrial areas of Venture Drive/Project Avenue (Note:
The New Noosa Plan includes the site within the Medium Impact Industry zone and is across the
road from the new Enterprise Precinct).

Although Specific Outcome O187 of the Business Uses Code makes all Entertainment & Dining
Businesses within the Industry Zone inconsistent, Council has recently approved two other Industrial
breweries within the zone, citing that the food and beverage use is ancillary and complementary to
the primary industrial use on-site, and will not cause any reverse amenity issues (MCU16/0112 –
Heads of Noosa & MCU16/0133 - Land & Sea).

Considering the definition of Industrial Business (below) within the current Noosa Plan, the industrial
‘making’ component of the use must not be less than 60% of the entire use area.

       Industrial Business means the conduct of an industrial business activity, where goods or
       products are produced, manufactured, dismantled, altered, repackaged, repaired or stored
       at a scale of greater than that defined by retail business. The use includes the sale of goods,
       resulting from such operations, provided that sales space does not exceed 20% of the use
       area. Any space dedicated for administration or accounting work in connection with such
       operations does not exceed 20% of the use area. The term includes the following types:

The application proposes to use 63% of the site for industrial making and associated administration
components; 11% of the site area is to be used for ‘back of house’ kitchen areas; and 26% of the
site area for the associated brew café (including the outdoor terrace). To ensure any impacts
associated with carparking are adequately addressed and the predominant use of the siteremains
industrial, the following Daytime and Evening trade hours are proposed for the site:




                                                                                           Page 10 of 13

Page 11

Daytime Hours
The applicant proposes does not propose to use the outside 55m2 terrace areas during the weekday
daytime hours, with only limited retail package sales and brewery tours proposed to occur in the
daytime. The industrial making components of the business are the dominant uses of the site during
the weekday daytime hours, consistent with the surrounding industrial business uses.

Evening Hours
After 5pm on weekdays and after midday on the weekends, the industrial businesses in the
surrounding area are predominantly closed. As a result, the applicant seeks to use the terrace areas
of the site for the brew cafe activities within the western portions of the site. This is at a time when
there are additional carparking opportunities onsite and offsite for any overflow parking.

The New Noosa Plan allows for a Food and Drink Outlet to be established as a code assessable
application if it is associated with and subordinate to an industry activity on-site and does not exceed
60m2. The Medium Impact Zone Code also describes the scale of supporting ancillary retail and
office uses to incorporate no more than 40% of the total gross floor area.

    AO1.1
    Retail sales, food and drink outlet and office uses are directly associated with, and ancillary to an industry activity on
    the same site and comprise a combined gross floor area of no more than 40% of the total gross floor area of
    the site with:
         a) any ancillary retail sales or office use component having an individual gross floor area no greater than
               30% of the total gross floor area of the site; and
         b) any food and drink outlet component having an individual gross floor area no greater than 30% of the
               total gross floor area of the site or 60m2 whichever is the lesser.


The proposed plans include 26% of the site to be used for the ancillary brew cafe during evenings
and weekends. This is consistent with The New Noosa Plan definitions for associated retail sales &
food and drink outlets.

The proposed restriction in use area to the western end of the shed is well designed and visually
attractive fronting the minor road. The design avoids impacts such as odour, noise, dust and other
wastes from the rest of the site operations and does not compromise the function and vitality of the
business centre or the Noosa Shire hierarchy.

4.2.2 Parking

The Specific Outcome of the Driveways and Carparking Code seek for enough onsite carparking is
provided to accommodate the number and type of vehicles likely to be generated by the
development, having regard to the hours of operation and likely number of users/servicing.

The applicable lease area at 130 Eumundi Noosa Rd can accommodate 12 equivalent parking
spaces, with 2 dedicated staff bays. All onsite carparking spaces demonstrate compliance with the
Australian Standard to leave in a forward gear, with staff parking restricted to bays 6 and 7.

A coaster bus (able to cater for 12 people) is also able to access, park and manoeuvre on the site
for group tours. The following table provides the use area split between the different components of
the brewing business.

Table 4: Parking Rates
 Use                Noosa Plan Carparking Rate     Use Area                  Parking Required     The New Noosa Plan
 Entertainment &    1 space per 10m2, or part      Dining Area = 115m2       13 bays              Bar - 1 space per 20m2 of
 Dining Business    thereof, of use area           Toilets = 15m2 (ground)                        use area.
 Type 3                                            *Total = 130m2                                 (6.5 spaces if 130m2 and
                                                                                                  9.25 bays if 185m2 –


                                                                                                               Page 11 of 13

Page 12

                                                                                                         counting kitchen and bar
                                                                                                         areas)
 Industrial            1 per 30m2 use area (up to       375m2                      9.5 bays              Medium Impact Industry -
 Business Type 2       150m2); AND                                                                       1 space per 50m² up to
                       1 space per 50m2 up to 500m2                                                      500m² (9.5 bays).
                                                                                   Total = 21.5 bays     Total = 16 bays
                                                                                                         (19 bays if including
                                                                                                          kitchen and bar areas)
* Not including kitchen and bar ‘back of house’ areas 55m2 - in accordance with the Driveways and Carparking rates for Entertainment &
Dining Business Type 1 (Food & Beverages) which excludes kitchen and food storage areas.


The highest carparking rate is attributed to the associated brew cafe. The application proposes to
limit the use of the brew café dining areas to evening hours during weekdays and after midday during
weekends. This is at a time when there are no staff onsite for the industrial making component of the
business and surplus overflow parking spaces within the surrounding area.

Considering the proposed changes to the carparking rates within the New Noosa Plan, the purchase
of a courtesy bus and the potential for overflow parking in the area in the evening and weekend hours
- there is enough onsite carparking provided to accommodate the number and type of vehicles likely
to be generated by the development, consistent with the Specific Outcomes of the code.

4.2.3 Landscaping

The carparking area does not require any increase in hardstand areas on the site. Existing
landscaping is to be supplemented around the carparking area and designed to ensure the retention
of large trees.
A landscaping terrace area has been constructed by the applicant to enhance the existing trees and
a handrail established on top of the landscaping retained area, which is no more than 1m above
existing natural ground levels. Additional landscaping beds will be provided to the west of the
carparking area to supplement the existing plantings.
The development is consistent with the relevant Specific Outcomes of the Landscaping Code.


5.0 State assessment and other matters
5.1 State interests
5.1.1 Matters established in the Planning Regulation

Nil

5.1.2 State Planning Policy

Consistent with the relevant Policy considerations.

6.0 Conclusion
This application seeks a Development Permit for Material Change of Use for an Industrial Business
Type 2 (Brewery) and associated Entertainment and Dining Business Type 3 (Brew Café) within the
Industry zone at 130 Eumundi Noosa Rd, Noosaville. The proposal is impact assessable development
under The Noosa Plan. The assessment finds the development meets the relevant Specific and
Overall Outcomes of the Noosa Plan subject to the following grounds of approval:

                                                                                                                      Page 12 of 13

Page 13

      The brewing components of the business are a consistent use within the Industry zone;
       however, the food and beverage use are inconsistent. Although the Planning Scheme does
       not provide support for the food and beverage use in the zone – the brew cafe is small scale,
       subordinate and related to the primary industrial use on site (brewery);
      Two other breweries have been recently approved and constructed within the Industry zone,
       and this proposal within an existing building is considered low intensity and does not
       compromise the function and viability of business centres or the centres hierarchy;
      The proposed building fitout is well designed and visually attractive, with the dining areas
       small scale and have a direct relationship with the industrial activities on the site;
      Sufficient separation is provided from onsite and other nearby industrial uses so as not to
       raise any adverse impacts, or reverse amenity issues; and
      The development provides adequate provision for onsite parking and manoeuvring at the
       different times of use, which is safe, functional and meet the reasonable requirements of the
       industrial and associated retail dining.

The Assessment Manager’s favourable consideration of the above development application is
therefore recommended. Please contact me if you require any further information and/or clarification
with respect to the above application.




                                                                                       Page 13 of 13

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.