Original source · versioned page text
2022-02-17 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 17 FEBRUARY 2022
a. a 2 metre wide concrete footpath within the road verge, the same colour as
the existing (dark), for the entire length of the site’s frontage to Doonella
Street;
b. a 2m wide concrete pathway for the full length of the ‘public thoroughfare’
easement, along the full length of the easement located along the northern
boundary
c. pedestrian pathways between the proposed car parking area and the
building/s;
d. adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts
or changes in surface materials or levels;
e. signage and lighting at strategic locations to direct people to building entries
and public toilet facilities;
f. bicycle parking spaces and lockers as shown on the approved Ground /
Carpark Plan (Plan SD02, Iss.12).
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with the
conditions of this Decision Notice.
Services
26. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
27. 27. Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater) which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
28. A 3 metre wide easement for “Public Thoroughfare” must be registered against the
title of the property in favour of Council. The easement must be located as shown,
in red, on Drawing No. SD03, titled “Level 1 Plan”, Issue 10, dated 31/05/2021 and
prepared by Archicology P/L.
29. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
30. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
31. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
32. All works must be carried out generally in accordance with geotechnical
investigation report 18151-001-Rev0, titled: “Proposed Commercial & Residential
Development 30-32 Doonella St Tewantin”, dated 22 June 2018 and prepared by
Tectonic Geotechnical and Environmental Engineers.
Page 16 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.