ORDINARY MEETING MINUTES 17 FEBRUARY 2022
Operational Works approval and the Water by Design Guidelines.
40. All stormwater quality treatment devices must be maintained in accordance with
the Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version
1). A copy of this document must be retained on the site together with the approved
Operational Works drawings for the stormwater quality treatment system and a
detailed life cycle costing of the system attached as an addendum. Records of all
maintenance activities undertaken must be kept and made available to Council
upon request.
41. Any proposed Community Management Statement required for the development
must include the Water by Design (2009) – Maintaining Vegetated Stormwater
Assets (Version 1) document and must include the full cost of maintaining the
system in accordance with that document.
42. Operating rainwater collection and stormwater harvesting tanks must be provided
as shown identified in section 6.2 of the Engineering Report & Stormwater
Management Plan report For Proposed Residential and Commercial Tenancies at
30-32 Doonella St (A6035/21/ENG/RevB). The tanks must be provided in
accordance with an Operational Works approval.
43. Certification must be submitted to Council from a qualified person* which certifies
that the rainwater collection tank/s and associated reticulation has/have been
installed in accordance with the requirements of this Decision Notice.
*(Refer to Advisory Note)
Acid Sulfate Soils
44. All waters, including stormwater runoff, groundwater seepage and leachate must
achieve the following quality prior to release from the site at all times:
a. a pH range of 6.5-8.5 pH units;
b. 50mg/L maximum total suspended solids concentration;
c. 0.3mg/L maximum total iron concentration;
d. 0.2mg/L maximum total aluminium concentration; and
e. no visible plume at either the point of release from the site or within a
waterway.
ENVIRONMENTAL HEALTH
Waste Storage
45. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy 9, Waste Management, including an external
imperviously paved area correctly sized for all refuse and recycling containers and
suitably screened from public places and neighbouring properties.
46. A bin wash area is required with a cold-water tap, hose and drain outlet connected
to sewer, via a bucket trap. The drain outlet is to be designed to prevent storm
water entry to the sewerage system which can be achieved by a bunded area, with
a nib wall height of 100mm maximum, enclosing a wash area of 700mm x 700mm
minimum (max 0.7m²). Alternatively, the waste area can be roofed, or any other
appropriate design approved by Council.
Noise
47. Written certification is required from a suitably qualified person confirming that
sound pressure levels from all mechanical plant and equipment comply with the
following:
a. Air-conditioning and Refrigeration
Page 18 of 33