                                                                                        SEDIMENT RELEASE GUIDELINES                                                            RUN-OFF FROM THE IMMINENT RAINFALL AND              ADDITIONAL CONTROL MEASURES AS DEEMED                    SUPERINTENDENT FOR THE LOCATION OF THE SITE
                                                                                                                                                                               RUN-OFF.                                            NECESSARY THROUGHOUT CONSTRUCTION.                       ACCESS POINT AND WASH DOWN AREA WHICH ARE TO
         SEDIMENT AND EROSION CONTROL:                                                  1.  ALL RELEASES OF STORMWATER CAPTURED ONSITE,                                  2.3. ALL REASONABLE AND PRACTICABLE STEPS HAVE      3.    THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL            BE MAINTAINED THROUGHOUT THE CONSTRUCTION
         CONTRACTOR TO ALLOW FOR PROVISION OF ALL                                           UNLESS OTHERWISE NOTED IN THIS STANDARD, MUST                                      BEEN TAKEN TO TREAT THE WATER WITHIN                SEDIMENT CONTROL DEVICES IN A FUNCTIONAL                 PERIOD.
         REQUIRED SEDIMENT AND EROSION CONTROL                                              NOT EXCEED THE FOLLOWING LIMITS:                                                   BEST-PRACTICE TIME FRAMES;                          ORDER AND REPLACE ALL BLOCKED SEDIMENT                8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE
         DEVICES IN ACCORDANCE WITH IECA AND COUNCIL                                      1.1. 50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A                               2.4. FLOCCULENT HAS BEEN APPROPRIATELY APPLIED            DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF                 BEEN FOUND TO BE DIFFERENT OR FAILED IN SERVICE,
         POLICIES AND GUIDELINES                                                                MAXIMUM CONCENTRATION;                                                         AND THE CONCENTRATION OF TSS IN THE                 MAINTENANCE OF WORKS.                                    CORRECTIVE ACTION IS TO BE UNDERTAKEN
                                                                                          1.2. TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE                                       CAPTURED WATER HAS ALREADY SIGNIFICANTLY      4.    CONSTRUCTION OF ALL SEDIMENT MANAGEMENT                  IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS'
                                                                                                BACKGROUND;                                                                    DECREASED.                                          DEVICES TO THE SATISFACTION OF THE                       ADDITIONS TO THE ORIGINAL APPROVED EROSION
                                                                                          1.3. pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5                                3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND             SUPERINTENDENT. SHALL BE COMPLETED AND                   CONTROL PLANS. SUCH AMENDMENTS ARE TO BE
                                                                                                EXCEPT WHERE, AND TO THE EXTENT THAT, THE                                  DISCHARGES FROM THE SITE, THE RELEASE LIMIT             EFFECTIVE PRIOR TO:                                      APPROVED BY SUPERINTENDENT, IF DEEMED
                              LEGEND                                                            NATURAL RECEIVING WATERS LIE OUTSIDE THIS                                  PRESCRIBED IN (1a) ABOVE MUST NOT BE EXCEEDED           a. STRIPPING OF TOPSOIL AND GRASS.                       NECESSARY AND RELEVANT.
                                                                                                RANGE.                                                                     UNLESS THE DEVELOPMENT IS IN FULL COMPLIANCE            b. BULK EARTHWORKS TO THE SITE.                       9. OVERALL
                                                                                        2. THE CONCENTRATION OF TSS RELEASED BY                                            WITH THIS STANDARD.                                     c. SERVICES INSTALLATION.                                a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD
                        |S|      SEDIMENT FENCE
                                                                                            DEWATERING MAY ONLY EXCEED 50mg/L WHERE IT                                                                                             d. PAVEMENT CONSTRUCTION                                     BE DIVERTED AROUND THE WORK SITE WHERE
                                                                                            CAN BE DEMONSTRATED AND SUPPORTED THROUGH                                  SEDIMENT CONTROL                                      5.    ALL SEDIMENT MANAGEMENT MEASURES ARE TO                      POSSIBLE.
                                 CONSTRUCTION ENTRY
                                                                                            DOCUMENTATION THAT:                                                                                                                    REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN         b. ALL DRAINAGE, EROSION AND SEDIMENT
                                                                                                                                                                       1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO             WRITING FROM THE SUPERINTENDENT TO REMOVE                    CONTROLS TO BE INSTALLED AND BE
                                                                                          2.1. FURTHER SIGNIFICANT RAINFALL IS FORECAST TO
                                                                                                                                                                          BE IN ACCORDANCE WITH INTERNATIONAL EROSION              ALL OR PART OF THE SILT CONTROL APPLICATIONS.                OPERATIONAL BEFORE COMMENCING UP-SLOPE
                                                                                                OCCUR BEFORE THE TSS CONCENTRATION IS
                                 INLET PIT SEDIMENT FILTER                                                                                                                CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES    6.    THE BULK EARTHWORKS AND SEDIMENT CONTROL                     EARTHWORKS.
                                                                                                LIKELY TO BE REDUCED TO 50mg/L;
                                                                                                                                                                          AND THE SPECIFICATIONS.                                  LAYOUT PLAN SHALL BE READ IN CONJUNCTION WITH            c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE
                                                                                          2.2. RELEASING A HIGHER CONCENTRATION OF TOTAL
                                                                                                                                                                       2. SEDIMENT AND EROSION CONTROL DETAILS SHOWN               THE APPROVED DRAWINGS.                                       CONTROLLED, EXPOSED SURFACES TO BE EITHER
                                                                                                SUSPENDED SOLIDS WILL RESULT IN A BETTER
                                                                                                                                                                          ARE MINIMUM REQUIREMENTS. IT IS THE                7.    PRIOR TO COMMENCEMENT OF CONSTRUCTION                        MULCHED, COVERED WITH EROSION CONTROL
                                                                                                ENVIRONMENTAL OUTCOME BY PROVIDING
                                                                                                                                                                          CONTRACTORS RESPONSIBILITY TO INSTALL                    APPROVAL IS TO BE OBTAINED FROM THE                          BLANKETS OR TURFED IF EARTHWORKS ARE
                                                                                                STORAGE FOR THE CAPTURE AND TREATMENT OF
                                                                                                                                                                                                                                                                                                EXPECTED TO BE DELAYED FOR MORE THAN 14

                                                                                  PEARL
                                                                                                                                                                                                                                                                                                DAYS.

                                                                                                                          STREET                                                                                                                                                         SEDIMENT FENCE
                                                                                                                                                                                                                                                                                         10. FOR SEDIMENT FENCE STANDARD DETAIL AND
                                                                                                                                                                                                                                                                                             SPECIFICATION REFER TO INTERNATIONAL EROSION
                                                                                        108                                                                                                                          107                                                                     CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
                                                                                                                                                                                                                                               107                                           PRACTICES STANDARD DRAWINGS SF-01 AND SF-02
                                                                                                                                                                                                                                                                                             SEDIMENT FENCE.
                                                                                                                                                                                                                                       D       D      D
                                                                                                                                                                                                                                                                                         TEMPORARY CONSTRUCTION ENTRY/EXIT
                                                                                                                                                                                                                                                                                         11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL
                                                                                                                                                                                                                                                                                             AND SPECIFICATION REFER TO INTERNATIONAL




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                             EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA)
                                                                                                                                                                                                                                                                                             BEST PRACTICES STANDARD DRAWINGS EXIT-01 AND




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                             EXIT-02 CONSTRUCTION EXIT - ROCK PAD
                                                                                                                                                                                                                                                                                             (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                             FOR BUILDING SITES AND EXIT-04 AND EXIT-05
                                                                                                                                                                                                                                                                                             CONSTRUCTION EXIT - VIBRATION GRID.




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                         KERB INLET
                                                                                                                                                                                                                                                                                         12. FOR KERB INLET STANDARD DETAIL AND




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                             SPECIFICATION REFER TO INTERNATIONAL EROSION
                                                                                                                                                                                                                                                                                             CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                             PRACTICES STANDARD DRAWING ESC-03 KERB INLET
                                                                                                                                                                                                                                                                                             SEDIMENT TRAPS




                                                                                                                                                                                                                                   D
                                                         |S|          |S|         |S|    |S|        |S|        |S|            |S|       |S|         |S|         |S|         |S|                                |S|     |S|                                                               REVEGETATION
                                                                                9
                    9




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                         13. FOR REVEGETATION STANDARD SPECIFICATION
                                                                              0
                   0
  ELM




                                                                            1




                                                                                                                                                                                                                                                                                             REFER TO INTERNATIONAL EROSION CONTROL
                 1




                                                                                                                                                                                                                             |S|
                                                                                                                                                                                                                                                                                             ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES




                                                                                                                                                                                                                                D
                                                                                                                                                                                                                                                                                             STANDARD DRAWING R-01 REVEGETATION GENERAL.




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                         FIELD INLET




                                                                                                                                                                                                                             |S|
                                                                                                                                                                                                                                                                                         14. FOR FIELD INLET STANDARD DETAIL AND




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                             SPECIFICATION REFER TO INTERNATIONAL EROSION
                                                                                                                                                                                                                                                                                             CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                             PRACTICES STANDARD DRAWING ESC-02 GRATED




                                                                                                                                                                                                                             |S|
                                                                                                                                                                                                                                                                                             STORMWATER (FIELD) INLET SEDIMENT TRAP.
  STREET




                                                                                                                                                                                                                                   D
                                                                                                                                                                                                                                                                                         OPERATION AND MAINTENANCE
                                                                                                                                                                                                                                                                                         15. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC




                                                                                                                                                                                                                             D
                                                                                                                                                                                                                              |S|
                                                                                                                                                                                                                                                                                             MEASURES SHALL BE INSPECTED:
                                                                                                                                                                                                                                                                                             · AT LEAST DAILY (WHEN WORK IS OCCURRING ON




                                                                                                                                                                                                                                  D
                                                                                                                                                                                                                                                                                                SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING
                                                                                                                                                                                                                                                                                                ON SITE)




                                                                                                                                                                                                                             |S|
                                                                                                                                                                                                                              D
                                                                                                                                                                                                                                                                                             · WITHIN 24 HOURS OF EXPECTED RAIN; AND
                                                                                                                                                                                                                                                                                             · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN
                                                                                                                                                                                                                                                                                                EVENT OF SUFFICIENT INTENSITY AND DURATION TO




                                                                                                                                                                                                                                  D
                                                                                                                                                                                                                                                                                                MOBILISE SEDIMENT ON SITE).




                                                                                                                                                                                                                             |S|
                                                                                                                                                                                                                                                                                         17. IN ACCORDANCE WITH NC ESC GUIDELINES,




                                                                                                                                                                                                                               D
                                                                                                                                                                                                                                                                                             MAINTENANCE OF ESC MEASURES SHALL OCCUR IN
                                                                                                                                                                                                                                                                                             ACCORDANCE WITH THE FOLLOWING TABLE:




                                                                                                                                                                                                                               D
                                                                                                                                                                                                                                                                                                                     MAINTENANCE SCHEDULE




                                                                                                                                                                                                                             |S|
                                                                                                                                                                                                                                                                                                                                            TIMEFRAME FOR COMPLETION




                                                                                                                                                                                                                               D
                                                                                                                                                                                                                                                                                             ESC MEASURES        MAINTENANCE TRIGGER
                                                                                                                                                                                                                                                                                                                                                 OF MAINTENANCE

                                                                                                                                                                                                                                                                                                                 WHEN SETTLED SEDIMENT




                                                                                                                                                                                                                               D
                                                                                                                                                                                                                                                                                             SEDIMENT BASIN                                    WITHIN 7 DAYS OF THE
                                                                                                                                                                                                                                                                                                               EXCEEDS THE VOLUME OF THE
                                                                                                                                                                                                                                                                                            (WHERE UTILISED)




                                                                                                                                                                                                                             |S|
                                                                                                                                                                                                                                                                                                                                                   INSPECTION
                                                                                                                                                                                                                                                                                                                 SEDIMENT STORAGE ZONE
                                                                                         109




                                                                                                                                                                                                                              D
                                                                                                                                                                                                                                                                                              OTHER ESC        1/3 OF THE CAPACITY OF ESC
                                                                                                                                                                 |S|         |S|    |S|       |S|       |S|   |S|     |S|                                                                                                                     BY THE END OF THE DAY
                                                                                                                                                                                                                                                                                              MEASURES           MEASURES IS EXCEEDED
                                                                                                                                                                                                                     108                                                                 REPORTING




                                                                                                                                                                                                                              D
                                                                                                                                                                                                                                                                                         18. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM
                                                                                                                                                                                                                                                                                             OF ESC MAINTENANCE AND CONTROL OF ALL STAGES




                                                                                                                                                                                                                              D
                                                                                                                                                                                                                                                                                             OF WORK FOR APPROVAL BY THE SUPERINTENDENT.

                                                                                                                     CLIENT DETAILS:                                                 PROJECT ADDRESS:                                      APPROVED BY:                PROJECT NAME:

                                                                                                                                                                                                                                                                       PROPOSED COMMERCIAL DEVELOPMENT
                                                                                                                                IRONBARK SMSF PTY LTD                                                                                                                  TITLE:                                     STATUS:

                                                                                                                                                                                                     48 ELM STREET                                                     EROSION AND SEDIMENT                       FOR APPROVAL - NOT FOR
 © ABN 89 647 469 707
                                         02   25/05/23   RFI UPDATE                            BP   BP    BP                                                                                        COOROY, 4570, QLD                                 BEN PARRY        CONTROL LAYOUT PLAN                        CONSTRUCTION
   75 NOOSA DRIVE                                                                                                                                                                                                                                     RPEQ: 28084
                                         01   09/02/23   OPW ISSUE                             BP   JB    JB         SCALE:
NOOSA HEADS, QLD 4567                                                                                                                                                                                                                              CPEng NER MIEAUST
    +61 7 5211 1003                    REV     DATE               DESCRIPTION                DWN    CHK   APP
                                                                                                                                         AS INDICATED                                                                                                DATE: 25/05/23
                                                                                                                                                                                                                                                                       DRAWING NUMBER:                            PROJECT NUMBER:                           SHEET REV:
                                                                                                                                                                                                                                                                                                                                                             SIZE:
RECORCONSULTING.COM                                                         REVISIONS
                                                                                                                                       DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                       030                                        20220206                                   A1 02
Log in to download the original file

civil.pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.