Council archive · source document
00156A98.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
NOOSA COUNCIL IDAS Development Application Decision Notice 11 of 14
Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
undertaken by either Council or a Council approved contractor.
In all cases, Council reserves the right to carry out rectification works in an emergency and where no
reasonable attempt has been made to complete the rectification works as part of the development. All
costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of
the Plan of Survey.
86. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
87. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
88. Where operational works are likely to affect nearby residents, at least 3 days notice of commencement of
work, the name of the site supervisor, and a 24 hour contact telephone number shall be distributed to
affected residents.
89. Prior to the issue of a Development Permit for Operational Works, the applicant shall comply with the
requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this
regard, a statutory declaration outlining the cost of building and construction works, as defined in s73.(1)
of the Act, shall be submitted in conjunction with an application for Operational Works. If payment of the
levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment
manager.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@5008a612\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156A98.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2007.00000070.001 [As Published]Related documentApplication case desk ↗
Decision Notice - 010.2007.00000070.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63 KB (small file)
- File type
No other editions are linked here.