Annual Report 2022-23

of 154
      Note 15. Property, Plant and Equipment (continued)
                                                                                                                                                   Index applied
                                                                 Last                                                                              (change in index     Other interim
                                              Valuation          comprehensive                      Key assumptions and estimates                  last applied to      revaluation
      Asset Class and Fair Value Hierarchy    approach           valuation date   Valuer engaged    (related data sources)                         asset class)         adjustment

      Other Infrastructure Assets (Level 3)   Current            30/06/2021       Australis Asset   No active market due to the specialised        ABS Producer         Nil
      2023: $49.9m                            replacement cost                    Advisory Group    nature of services these assets provide.       Price Index: 3020
      2022: $50.8m                                                                                  Unit rates are developed by estimating         Non-residential
                                                                                                    labour and materials required for asset        building
                                                                                                    replacement. Base rates were sourced           construction,
                                                                                                    using actual contract prices for recently      Queensland
                                                                                                    completed projects or supply quotes for        Most Recent
                                                                                                    similar assets based on age, size,             Index Applied:
                                                                                                    location and condition. Other inputs           5.3% equivalent to
                                                                                                    considered include obsolescence, asset         1 year (2023)




                                                                                                                                                                                        Noosa Council Annual Report 2022 - 2023
                                                                                                    condition and useful life.
                                                                                                    Where costs are not available, rates
                                                                                                    were obtained from the valuer's
                                                                                                    database or the Rawlinson's Australian
                                                                                                    Construction Handbook, 2021 Edition.
      Roads (Level 3)                         Current            30/06/2023       Stantec           Unit rates are developed using actual          ABS Producer         Nil
      2023: $456.3m                           replacement cost                                      contract prices for recently completed         Price Index: 3101
      2022: $452.4m                                                                                 projects or supply quotes for similar          Road and bridge
                                                                                                    assets based on age, size, location and        construction,
                                                                                                    condition.                                     Queensland
                                                                                                    A first principles approach has been           Most Recent
                                                                                                    applied to developing unit rates by            Index Applied:
                                                                                                    estimating plant, material and labour          10.1% equivalent
                                                                                                    inputs required for design and                 to 2 years (2022)
                                                                                                    construction.
                                                                                                    Where costs are not available rates were
                                                                                                    obtained from the valuer's database or
                                                                                                    the Rawlinson's Australian Construction
                                                                                                    Handbook, 2023 Edition.
                                                                                                    Roads are categorised as sealed or
                                                                                                    unsealed and separated into segments
                                                                                                    with three location factors for urban, rural
                                                                                                    and commercial/industrial. All segments
                                                                                                    are then componentised into sub-classes
                                                                                                    that make up each segment. i.e. road
                                                                                                    surface, road pavement base, road
                                                                                                    pavement sub-base, formation, kerb,
                                                                                                    footpath, signage, etc. Other inputs
                                                                                                    considered include obsolescence, asset
                                                                                                    condition and useful life.




258                                                                                                                                                                                     259

Log in to download the original (Annual Report 2022-23(PDF, 12MB).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.